Lithuania

In short

Lithuania has submitted its draft National Building Renovation Plan and, in June 2026, amended its Construction Law to transpose parts of the EPBD, including zero-emission buildings. It has also strengthened its rules for technical building systems. Next come the final plan in December 2026 and a pathway to phase out fossil-fuel boilers.

Lithuania’s progress on the EPBD

Steps Lithuania has already taken and the obstacles ahead.

Progress unlocked

  • Draft NBRP submitted
  • xxxxxxxx, xx xxxx xxxx, xx xxx xx. xx-xxxx xxxxxxxx xxx xxxxxxxxxxxx xxx. xx xxxxxxxx xxxxxxx xxxxxxx xxxxxxxx xx xxxx (xxxxxxxx xxxxxxxxxx, xxx, xxx.).
  • xxxxxxxxxxxx xxxxxxxxx xxxxxxxx xxxxxxx xxx xxxxxxxxxx xxxxxxxxxxxx (xxxxxxxxx xxx) xxxxxxx xxxxxxxxxxx xxxxx xx-xx xx xxx xxxx.

Obstacles ahead

  • Establish a clear national life-cycle GWP roadmap
  • xxx x xxxxxxxx xxxxxxx xx xxxxx-xxx xxxxxx xxxx xxxxxxx
  • xxxxxxx xxxxxx xxxxxxxxxxx xxxxxxxxx xxx xxxxxxxx xxxxxxxxxx xxxxxxxxxx xxx xxxxxxxxxxx xxxxxxxxx

What comes next for Lithuania

The next deadlines.

Next checkpoint

xxxxxxxx xxxx: xxxxx xxxx

Log in to read this section

This section is open to Renovate Europe partners, and to policymakers, media and public authorities with a reader account.

Topic by topic

Open a topic to see the answer, the sources and what the EPBD requires.

Coordinating ministry

xxx xxxxxxxx xx xxxxxxxxxxx.

Map the stock

Building databasexxxxxxxx xxxxxxxx, xxxxxxx xxxxxxxx

A national database on the energy performance of individual buildings and of the whole building stock. EPBD Article 22 Glossary

Status
xxxxxxxx xxxxxxxx, xxxxxxx xxxxxxxx

xxxxxxxxx xxxxxxxx x xxxxxxxx xxxxxx xxx xxxxxxxx xxx, xxxxx xxxxxxxx xxxx, xxx xxxxxxxx xxxx xxxx xxxxxxxxxxx xxxxxx (xxxxx). xxxxx xxxxxxxxxxx xxxx xxx xxxxx-xxxxxxxxx xxx xxxxxxxxxxx xxxxx xxxxxx xxxxxxxxx, xxxxxxxxx xxxxxxxxxxxxxxx, xxxxxxxxx, xxxxxx xxxxxxxxxx xxx xxxxxxxxxxx.

The database includes

  • xxx xxxx
  • xxxxxxxx xxxx / xxx
  • xxxxx xxxx
  • xxxxxxxxxxxx xxxxxx / xxx
  • xxxxxxx xxxxxx xxx
  • xxxxx xxxxxx xxx
  • xxxxxxxxxx xxx xxxxxxxxx
  • xxxxxxx xxxxxx / xxxx xxxx
  • xxxxxxxxx xxxxxx xxxxxxxxxxxxx
  • xxxxx-xxxxxxxxxx xxxxxxxxx

Who can access it

  • xxxxxxxx xxxxxxxxxx
  • xxxxxxxxxx xx xxxxxx xxxxxxxxxxx xxxx
  • xxxxxxxxxx xx xxxxxxxx xxxxxxxxxxxx

Sources

  • xxxx: xxxxxxxx xx xxxxxx xxxxxxxxxxx xxxxxxxxxxxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxxxx xxxx xxxx xxxxxxxxxxx xxxxxx xxxxxxxx
  • xxxxxxxxxxx xxxxxxxx xxx xxxxxxxxxxxx xxxxxxx: xxxxxxxx xxxxxxxxxx
  • x-xxxxxx: xxxxx xxx xxxx.xxxxx
Calculation methodxxxxxxx xxxxxx

The national method for calculating the energy performance of buildings, on which energy performance certificates and minimum requirements are based. EPBD Article 4 and Annex I Glossary

Status
xxxxxxx xxxxxx
Harmonised across the country
xxx

xxxxxxxxx xxx x xxxxxxx xxxxxxxx xxxxxxxxxxx xx xxx x.xx.xx:xxxx xxx xxxxxxxxxxx xxx xxxxxxxxxx xxxxxxxx xxxxxx xxxxxxxxxxx. xx xx xxxxxxx xxxxxxxxxx xxx xxxxxxxx xxx xxxxxxxx x++ xxxxxx xxxx-xxxxxx xxxxxxxx.

xx xxxxxxxxx, xxxxx xx-xxx xx xx xxxxxxxx xxxx, xxxxxxx xxxx xxxxx xx x xxxxxxx xxxx.

Sources

  • x-xxxxxx: xxxxx xxx, xxxxxxx xxxxxxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxx xxxxxxxxxxxx, xx xxx xxxx (xxx)
  • xxxxxx: xxxxxxxxxx xx xxx xxxxxxxxxxxx xxx xx xxxxxxxx xxxxxx xxxxxxxxxxx
  • x-xxxxxx: xxxxx xxx
Energy performance certificatesxxxxxx xxxxx xxxxxxxxxxx xx xxxxxxx xxxxxx

A certificate rating a building’s energy performance on a scale from A to G, with recommendations to improve it. EPBD Articles 19 to 21 Glossary

Status of the EPC reform
xxxxxx xxxxx xxxxxxxxxxx xx xxxxxxx xxxxxx

xxxxxxxxx xxx x xxxxxx xxxxxxxx xxx xxxxxx xxx xxxxxx xxxxxxxx. xxxxxxxxxxxxx xxxxxxx xx xxx xxxxxxxxx xxx xxxxxxxxx xxxxxxxxxxxx xxx xxxxxxxxxxx, xxxx xxxxxxxxx xxxxxxx xxx xxxxxxxx xxxxxxx. xxx xx-xxxx, xxxxxxx xx xx xxxx xxxx, xxxxxx xxxxxxxxxx xx xxx xxxxxxxxxxxx xxx, xxxxxxxxx xxxxxxx xx, xx xxxxxxxxxx xxxx xxxx xxxxxxxxxxxxxx. xxxx xxx xxxxxxx xxxxxxxxxxxxx xxx xxxxxxxxxxx xxxxxx, xxxxxxxxx xxxxxx xxxxxxxx xx xxxxx xxxxxxxxxxx xxxxxxxxx.

Challenges

  • xxxx xxxxxxx
  • xxxx xxx xxxxxxxx xxxxxx
  • xxxx xxxxxxxxxxx
  • xxx xxxxxxxxxxxx xxxxxx xx xxxxxxxxxx xxxxxxx

Sources

  • xxxx: xxxxxxxx xx xxxxxx xxxxxxxxxxx xxxxxxxxxxxx
  • xxxx: xxxxxx xxxxxxxxxxx xxxxxxxxxxxxx xx xxxxxxxxx
  • x-xxxxxx: xxxxx xxx, xxxxxxx xxxxxxx
  • xxxxxx: xxxxxxxxxx xx xxx xxxxxxxxxxxx xxx xx xxxxxxxx xxxxxx xxxxxxxxxxx

Plan the route

National Building Renovation Planxxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxxxxx

Each Member State’s plan to renovate its national building stock into a highly energy-efficient and decarbonised building stock by 2050, with targets for 2030, 2040 and 2050. EPBD Article 3 and Annex II Glossary

Status
xxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxxxxx

xxxxxxxxx xxxxxxxxx xxx xxxxx xxxxxxxx xxxxxxxx xxxxxxxxxx xxxx xx x xxxxxxx xxxx.

Sources, including the draft plan

  • xxxxxxxx xxxxxxxxxx: xxxxxxxx xxxxxxxx xxxxxxxxxx xxxxx
  • xxxxxxxx xxxxxxxxxx: xxx xxxxxxxxxx’x xxxxx xxxxxxxxxx xx xxx xxxxx, xx xxxx xxxx
Renovation passportxxxxxx xxxxx xxxxxxxxxxx

A tailored, step-by-step plan for the deep renovation of a specific building, prepared by a qualified expert. EPBD Article 12 Glossary

Status
xxxxxx xxxxx xxxxxxxxxxx

xxx xxxxxxxx xx xxxxxxxxxxx xxxxxxxxx xxxxxxxxxx xxx xxxxxxxxxxxx xx x xxxxxxxxxxx xxxxx (xxxxxxxxxx xxxxxxxx) xx xxxx xx xxx xxxxxxxxxx’x xxxxxxxxxxxxxx xxxxxxxxx.

How it is or will be designed

  • xxxxxxxxx xxxxxx
  • xxxxxxx xxxx
  • xxxxxx xx xxxx
  • xxxxxx xxxxxxxx xxxx xxxx
  • xxxxxxxx-xxxxxxxx xxxxxx xxxxxxxxxx xxxxxxx
  • xxxxxxxx xxxx xxxxxxxxx
  • xxxxxxxx xxxxxx xxxxxxx xxxxxxxx
  • xxxxxxxx xxxxxxxxx xxxxxxxxxxx
  • xxxxxxxx xxxxxxxx xxx xxxxxx xxxxxxxxxx
  • xxxxxxxx xxxxxxxxxxxxxxx xxx xxxxxx-xxxx xxxxx-xxx
  • xxxxxxxx xxxxxx xxxxxxx xx xxxxxx xxxxxxxxxxx

Who can issue it

xxxxxxx

Sources

  • xxxxxxxx xx xxxxxxxxxxx: xxxx xxxxxxxxxxxx, xx xxx xxxx (xxx)
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxx xxxxxxx xxxx, xx xxxxx xxxx (xxx)
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxxxxxxxx xx xxxxxxxxxxxx, xxxx xxx xxxx (xxx)

Set the standards

Zero-emission buildingsxxxxxxxxxx xxxxxxx

A building with a very high energy performance that needs zero or a very low amount of energy, produces no on-site carbon emissions from fossil fuels and zero or very low operational greenhouse gas emissions. EPBD Article 7(1), Article 11 Glossary

Status of the definition
xxxxxxxxxx xxxxxxx
Ready for the EPBD deadlines for new buildings
xxx
Used as a benchmark for deep renovation
xxxxx xxxxxxxxxx

xxx xx-xxxx, xxxxxxx xx xxxx xxxx, xxxxxxxxxx xxx xxx xxxxxxx xxx xxxxxxxxxxx.

xxx xxxxxx xxxxxxxxxxx xxx xxxxxxxxx xxx xxxxxxxx xxxx-xxxxxxxx xxxxxxxxxxxx xx xxxxxx-xxxx-xxxxx xxx xxxxxxxxx xxxx xxxx xxx xxxxx xxx xxxxxxxxx xxxx xxxx

xxxxxxx xxxxxxxx xxxxxxxxxxxx (xxxxxxxxx xxxxxx xxxxxxxxxx, xxxxxxxxxxx xxxxxxxxxx-xxx xxxxxx, xxxxxxxx xxxxxx xxxxxx xxxxxxxxxx xxx xxxxxxxxx xxxxxx xxx xxxxxxxx xxxxxxxxx) xxxxx xx xxxxxxxxxxx xxxxxxx xxxxxxxxxxx xxxxxxxxx xxxxxxxxxxx.

Sources

  • x-xxxxxx: xxxxx xxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxxxxxxxx xxx xx xxxxxxx xxxx xxxxxxxxxx
MEPS and trajectories for residential buildingsxxx-xxxxxxxxxxx xxxxxxxxx: xx xxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxx xxxxxxxxx: xx xxxxxxxxxxx xxxxxxxxxx

Rules that require non-residential buildings to meet a minimum energy performance by set dates, starting with the 16% worst-performing by 2030 and the 26% by 2033. EPBD Article 9(1) Glossary

Each Member State’s national trajectory to reduce the average primary energy use of residential buildings by at least 16% by 2030 and 20 to 22% by 2035, compared with 2020. EPBD Article 9(2) Glossary

Non-residential buildings
xx xxxxxxxxxxx xxxxxxxxxx
Residential buildings
xx xxxxxxxxxxx xxxxxxxxxx

xxxxxxxxx xxx xx xxxxxxxxxxx xxxxxxxx xxxxxxxxxx xxxxxx xxx xxxxxxxxx xxxxxxxxx, xxxxxxxxx xxx xxxx-xxxx xxxxxxxx xxxxxxxxxx xxxxxxxx, xxx xxxx xxxxxxxxxxxxxx xxxx, xxxxxxxxxxx xxxxxxxxxx xxxxxxx xxxxxxxx xxx xxx xxxxxxx xxxxxxxx xxxxxx xxx xxxxxxx xxxxxx xxxx. xxxxx xxxxxxxxxxx xxxxxxx xxxxxx xxxxxxx xxx xxxxxxxx-xxxxxx xxxxxxxxxxxxxxx.

Coverage

  • xxx-xxxxxxxxxxx xxxxxxxxx
  • xxxxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxx
  • xxxxx-xxxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxxxx

Sources

  • xxxxxxxx xxxxxxxxxx: xxxxxxxx xx xxx xxxxx xxxx (xxx)
  • xxxxxxxx xx xxxxxxxxxxx: xxxx xxxxxxxxxxxx, xx xxx xxxx (xxx)
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxx xxxxxxx xxxx, xx xxxxx xxxx (xxx)

Activate smart performance

Technical building systemsxxxxxxx xxxxxx xxxxxxx

A building’s equipment for heating, cooling, ventilation, hot water, built-in lighting, automation, on-site renewables and storage. EPBD Article 13 Glossary

Status
xxxxxxx xxxxxx xxxxxxx
Checks required after installation
xxxxxx

xxxxxxxxx xxxxxxxxx xxxxxxx, xxxxxxxxxxx xxx xxx-xxxxxxxxxxxx xxxxxxx xxx x.xx.xx:xxxx. xxx xxxxxxxxxx xxx xxxxxxx xx xxxxxxxxxxx xxxxx xx-xx xx xx xxx xxxx.

xxx xxxxx xxxxxxxxxx xxxxxxxxxxxx xx xxx xxxxxxxxxxxx xx xxxxxxxxx xxxxxxxx xxxxxxx xxxx xxxx xxx xxxxxxxxxx xx xxxxxxxx.

Systems covered

  • xxxxxxx
  • xxxxxxx
  • xxxxxxxxxxx
  • xxxxxxxx xxx xxxxx
  • xxxxxxxx
  • xxxxxxxx xxxxxxxxxx xxx xxxxxxx
  • xx-xxxx xxxxxxxxx xxxxxx
  • xxxx xxxxx
  • xxxxxxxx xxxxxxx xxx xxxxxxx xxxxxxxxxx

Sources

  • x-xxxxxx: xxxxx xxx
Automation and control (BACS)xxxx xxxxxxxxxxxx xxxxxxx xx xxxxxxxxxxx

Software and controls that run a building’s heating, cooling, ventilation and lighting automatically and efficiently. EPBD Article 13(9) to (12) Glossary

Status
xxxx xxxxxxxxxxxx xxxxxxx xx xxxxxxxxxxx
Requirements for non-residential buildings include
xxx
Aligned with the EPBD deadlines
xxx, xxxxx xxxxxxx xxx xxxx

xxxxxxxxx xxxxxxxxx xxxxxxx, xxxxxxxxxxx xxx xxx-xxxxxxxxxxxx xxxxxxx xxx x.xx.xx:xxxx. xxx xxxxxxxxxx xxx xxxxxxx xx xxxxxxxxxxx xxxxx xx-xx xx xx xxx xxxx.

xxx xxxxxxxx xxxxxxxxxx xxxxx xx xxx-xxxxxxxxxxx xxxxxxxxx, xxxx xxxxxxxxx xxxxxxx xxxxxxxxx xxxxxxx, xxx xxxxxxxxxxxx xxx xxxxxxxx xxxxxxx/xxxxxxxxxxx xx xxxxxxx/xxxxxxxxxxx xxxxxxx. xxx xxxxxxxxxx xxxxxxxx x xxxxxxxxxxxxx xxxxx xxxxxxxxxxxx xx xxx xxxxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxx.

xxx xxx xx xxxxxxxxxx xxx xxxxxxx xxxxxxx xx xxx xxxxxxxxxx xxxxxxxxx xxxxxxxxxxx xxxxx xx-xxx xx xx xxxx xxxx.

xxx xxx xx xx xxxxxxxxxxx xxxxxxx xx xxxxx xx-xx xxx xx xxxxxxxxx xx xxxxx xxxx xx xxxxxxxx xxxx.

xxxxx xx-xx xxxxxxxx xxx xxxxxxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxxxxxx xx xxxxxxxx xxx-xxxxxxxxxxx xxxxxxxxx.

Sources

  • x-xxxxxx: xxxxx xxx
Indoor environmental qualityxxxxxxxxxxxx xxxxxxxxxxx

The conditions inside a building that affect people’s health and wellbeing, such as temperature, humidity, ventilation and pollutants. EPBD Article 13(4) Glossary

Requirements in national rules
xxxxxxxxxxxx xxxxxxxxxxx
Linked to renovation or upgrades
xxxxxx

xxxxxxxxx’x xxxx xxxxxxxxx xxxxxxxxxx xxxxxxxxxxx xxxxxxx xxxxxxxxxxxx xxxxxxxx xx xxxxxx xxxxxxxxxx. xxx x.xx.xx:xxxx xxxxxxxx xxxxxxxxxxx, xxx xxxxxxxxxxxx xxx xxx-xxxxxxx xxxxxxxxxxxx xx xx xxxxxx xxxxxxxxx xx x xxxxxxxx’x xxxxxxx xxx xxxxx xx xxxx xxxxxxxxx xxxxxx xxxxxxxxxxxx xxx xxx-xxxxxxxxxxx xxxxxxxxxx xxx xx xxxxxxxxxx. xxx xxxxxxxxxxx xxxx xxxxxxxx xxxxxxxxxx xxxxx xxx xx xxxx xxxxxx-xxxxxxx xxx-xxxxxxx xxxxxxxxxxxx.

xxx xxxxxxxxxx xxx xxxxxxx xxxxx xx xxx xxxx, xxxxxxxxx xxx xxxxxxxxxxxx xx xxxxxx xxxxxxxxxxxxx xxxxxxxxxx xxxxxxx xxxxxxxx xxxxxxxxxx xxxxxxx xxxxx xxxxxxxxxxx, xxxxxxxx xxxxxxxx, xxx xx xxxxx xxx-xxxxxxx xxxxxxx.

Elements covered

  • xxxxxx xxx xxxxxxx
  • xxxxxxxxxxx
  • xxxxxxx xxxxxxx
  • xxxxxxxx
  • xxxxxxxx
  • xxxxxxxxxxx xxxx
  • xxxxxxxx xxxxxxx
  • xxxxxxxxxxxx xxx xxxxxxx xx xxxxxx xxxxxxxxx

Sources

  • x-xxxxxx: xxxxx xxx xxxx.xxxxx
  • x-xxxxxx: xxxxx xxx xxxx.xxxxxx, xxxxxxx xxxxxxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxx xxxxxxxxxxxx, xx xxx xxxx (xxx)
  • x-xxxxxx: xxxxx xxx xxxx.xxxxxx, xxxxxxx xxxxxxx
Smart readiness indicatorxx xxxxxxxx xxxxxxxxxx

An optional EU rating of how well a building can adapt its operation to the needs of its occupants and of the grid, and improve its efficiency. EPBD Article 15 Glossary

Status
xx xxxxxxxx xxxxxxxxxx

Building types covered

xxxxxxx

Sources

  • xxxxxxxx xxxxxxxxxx: xxx xx xx xxxxxxxxx

Cut the carbon

Whole-life carbonxxxxxxxxxxx, xxxxxxx xx xxxxx xxxxx xxxxxxxxxxx

All the greenhouse gas emissions of a building over its life: making and transporting materials, construction, energy use, replacements and demolition. EPBD Article 7(2) and (5) Glossary

Status
xxxxxxxxxxx, xxxxxxx xx xxxxx xxxxx xxxxxxxxxxx

xxxxxxxxx xx xxxxxxxxxx x xxxxxxxx xxxxx-xxxx xxx xxxxxxxxxxx xxx xxxxxxx xxxxxxxxxx xxxxx xxx xxxxxxxxxxx xxxx xxxxx. xxx xxxx xxxx xxx xxxxxxxxxxxx xxxxxxxxx-xxxx xxxxxxxxxx.

Steps taken

xxxxxxx

Sources

  • xxxx: xxxxxxx xx xxxx-xxxxx xxxxxxxxxx xxxxx xxx xxxxxxxxx
  • xxxxxx: xxxxxxxxxx xx xxx xxxxxxxxxxxx xxx xx xxxxxxxx xxxxxx xxxxxxxxxxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxx xxxxxxxxxxxx, xx xxx xxxx (xxx)
Phasing out fossil fuelsxxxxxxxxx xxxxxxxxxx xxx xxx xxxxx-xxxxx xxxxxx-xxxx xxxxxxx xxxx xxxxx

Since 1 January 2025, Member States can no longer offer financial incentives for installing stand-alone boilers powered by fossil fuels, and they must plan the phase-out of fossil-fuel boilers. EPBD Article 13(7), Article 17(15) Glossary

Financial incentives for new stand-alone fossil-fuel boilers ended
xxx
National pathway to phase out fossil fuels in heating and cooling
xx xxxxxxxxxxx
Oil boilers in new buildings
xx xxx xxxxxxxxxx
Oil boilers in existing buildings
xx xxx xxxxxxxxxx
Gas boilers in new buildings
xx xxx xxxxxxxxxx
Gas boilers in existing buildings
xx xxx xxxxxxxxxx
Coal heating
xx xxx xxxxxxxxxx
Stand-alone fossil-fuel boilers
xx xxx xxxxxxxxxx
Fossil-fuel connections in new buildings
xx xxx xxxxxxxxxx

xxxxxxxxx xxx xxxxxxx x xxxxxxxxxxx xxxxxxxxx xxx xxxxxx xxxx-xxxxxxxx xxxxxxxxx xxx xxxxxxxxx xxxxxxx xxxxxxxx xxxxxxxxxx xxxxxxx xxxxxx-xxxx xxxxxxxxxx.

xxxxxxxxx’x xxxx-xxxx xxxxxxxxxx xxxxxxxx xxx xxxxxxx xxxx xxxxxxx x xxxxxxxxxx xxxxxxx x xxxx xxxxxx-xxxxxxxxx, xxxxxx-xxxx-xxxxxxxxxxx xxxxxxxx xxxxx xx xxxx.

Sources

  • xxxx: xxxxxxxxx xxxxxx-xxxx xxxxxxx
  • xxxxxxxx xx xxxxxx: xxxxx xxxxxxx xxxxxxxx xxxxxx xxx xxxxxxx xxxx (xxx)
  • xxxxxxxx xx xxxxxxxxxxx: xxxx xxxxxxxxxxxx, xx xxx xxxx (xxx)

Enable delivery

Financing renovationsxxxxxxxxx xx xxxxxx xx xxxxxxxxxx xxxxx xx xxxxxx xxxxxxxxxxx

The grants, loans, tax breaks and other support Member States give for renovation, which must be linked to the energy savings targeted or achieved. EPBD Article 17 Glossary

Linked to renovation depth or energy performance
xxx
Measures for vulnerable and energy-poor households
xxx

xxxxxxxxx xxxxxxxx xxxxxx, xxxxxxxxx, xxxxxxxxxxxx xxxx-xxxx xxxxxxxxxx xxxxx, xxxxxxxxxx/xxxxxxx xxxxxxx, xxxxxx-xxxxxxxxxxx xxxxxxxxx xxx xxxxxxxx xxxxxxxxxx xxx xxxxx-xxxxxxxxx, xxxxxx xxx xxx xxxxxxxxx. x xxxx xxxx xxxx €xxx xxxxxxx xxxx xxx xxxxxxxxxxxxx xxxx xxx xxxxxxxx xx xxxxx xxxxx x xxxx xx% xxxxxxx-xxxxxx xxxxxxx.

xxx xxxxxx xxxxxxx xxxx xxxx xxxxx xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx xxx xxxxxxxx xxxxxx.

National financing instruments

  • xxxxxx
  • xxxxxxxxx
  • xxx-xxxxxxxx xxxxx
  • xxxxxxxxxx xxxxx
  • xxxxxx xxxxxxxxxx
  • xxxxxxx xxxxxxx
  • xxxxxx xxxxxxxxxxx xxxxxxxxxxx
  • xxxxxx xxxxxxx xxxx xxxxxxxx
  • xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx
  • xxxxxxx xxx xxxxx-xxxxxxxxx xxxxxxxxx
  • xxxxxxx xxx xxxx
  • xxxxxxx xxx xxxxxx xxxxxxxxx

Sources

  • xxxxxxxx xx xxxxxxxxxxx: xxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxx xx xxxxx xxxxxx xxx xxxx xxxxxx
  • xxxx: xxxxxxxxx xxxxxxxx xxxxxxxxxx xx xxxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxx xxxxxxx xxxx, xx xxxxx xxxx (xxx)
  • xxxxxxxx xx xxxxxxxxxxx: €xxx xxxxxxx xxxx xxx xxxxxx xxxxxxx xxxx xxx xxxxxxx xxxxxxxxxxxxx
One-stop shopsxxxxx, xxxxx, xxxxxxxx xx xxxxxxx xxxxxxxx

An advice centre that guides homeowners, businesses and public bodies through a renovation, from the technical options to financing. EPBD Article 18 Glossary

Status
xxxxx, xxxxx, xxxxxxxx xx xxxxxxx xxxxxxxx

xxxxxxxxx xxx xxxxxxxx xxxx/xxxx xxxxxxxxxxx xxx x xxxxxxxxxx xxxxxxxxxx xxxxxx.

xxx xx. xx-xxxx, xxxxxxx xx xx xxxx xxxx, xxxxxxxx xx xxxxxxxxxxx xx xxxxxx xxxxxxxxxx xx xxx xxxxxxxx xx xxxxxxxxxxx xx xxxxxxxxx xxx-xxxx-xxxx xxxxxxx xxxxxxxxx xxxxxxxxxx xxxxxx xxx xxxxxxxxxxxxxx xxxxxxxxxx.

xxx xxxxxx xxxxxxx xxxx xxxxxxxx xxx xxxxxxxx xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx xxx xxxxxxx xxxxxxxxxx.

Services provided

  • xxxxxxxxx xxxxxx
  • xxxxxxxxxxxxxx xxxxxxx
  • xxxxxxxxx xxxxxx
  • xxxxxxx xxxx xxxxx xx xxxx xxxxxxxxxxxx
  • xxxxxx xxxxxx
  • xxxxxxxxxx xxxxxxx
  • xxxxxxxxxx xxxxxxxx
  • xxxxxxx xxxxxx xxxxx
  • xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx
  • xxxxxxx xxx xxxxx-xxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxx

Who runs them

  • xxxxxxxx xxxxxxxxxx
  • xxxxx xxxxxxxxxxx
  • xxxxxx xxxxxxxx

Sources

  • xxxxxxxx xx xxxxxxxxxxx: x xxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxx xxxx xx xxxxxxx
  • xxxxxx: xxxxxxxxxx xx xxx xxxxxxxxxxxx xxx xx xxxxxxxx xxxxxx xxxxxxxxxxx
  • xxxxxxxx xx xxxxxxxxxxx: xxxxxx xxxxxxx xxxx, xx xxxxx xxxx (xxx)
  • x-xxxxxx: xxxxx xxx
Skills and workforcexxxxxxxx xx xxxxx xxxxxxxxxxx xxxxxxx xx xxxxxxxxxxx

Education and training to build a skilled workforce able to deliver renovations at the scale needed. EPBD Article 17(12) Glossary

National skills or training initiative
xxxxxxxx xx xxxxx xxxxxxxxxxx xxxxxxx xx xxxxxxxxxxx
Workforce shortages a barrier
xxx, xxxxx xxxxxxx

xxxxxxxxx xxx xxxxxxxx xxxxxxxxxxxxx xxxxxxx xxx xxx xxxxxxx xxx xxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxx, xxxx x xxxxx xx xxxxxx xxxxxxxxx xxxx xxxxxxx xxx xx-xxxxxxxxx xxxxxx xxxxxx xx xxxxxxxxx. xxxxx xxxxx xxxx xxxxxxxxxx, xxxxxxxxx, xxxx xxxxx, xxxxxxxxx xxxxxxx, xxxxxxxx, xxx, xxxxxxxxxxxxxx, xxxxxx xxxxxxx xxx xxxxxxxx xxxxx-xxxx-xxxxxx xxxxx.

Groups covered

  • xxxxxxxxxxxx xxxxxxx
  • xxxxxxxxxx
  • xxxx xxxx xxxxxxxxxx
  • xxxxxx xxxxxxxx
  • xxx xxxxxxxxx
  • xxxxxxxxxx
  • xxxxxxxxx
  • xxxxx xxxxxxxxxxx
  • xxx-xxxx xxxx xxxxxxxx
  • xxxxxxxx xxxxxxxx
  • xxxxxx xxxxxxx xxxxxxxxx

Topics covered

  • xxxx xxxxxxxxxx
  • xxxxxx xxxxxxxxxx xxxxx
  • xxxxxxxx xxxxxxxx
  • xxxx xxxxx
  • xxxxxxxxx xxxxxxx xxx xxxxxxx
  • xxxxx xxxxxx
  • xxxxxxxx xxxxxxxxxx xxx xxxxxxx
  • xxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxxxxxx xxxxxxx
  • xxxxx-xxxx xxxxxx
  • xxxxxx xxxxxxx / xxxxxx xxxxxxxxxx
  • xxxxxx xx xxxxxxxxxx

Sources

  • xxxxx xx: xxxxx xx xxxxxx xxxxxxxx
  • xxxx: xxxxx xx xxxxxx xxxxxxxxx xxxx xxxxxxx (xxx)
  • xxxxx xx: xxxxxx xxxxxx xx

Commission feedback on the draft renovation plan

xxxxxxxx xxxxxxxxxx, xx xxxx xxxx, xx xxx xxxxx xxxxxxxx xxxxxxxx xxxxxxxxxx xxxx xx xxxxxxxxx.

The Commission’s overall assessment

xxxxxxxxx xxxxxxxxx x xxxxxxxxxxxxx xxx xxxxxxxx xxxxx xxxx xx x xxxxxxx xxxx. xxx xxxxx xxxx xxxx x xxxxxxx xxxxxxx x xxxx xxxxxx-xxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxx xxxxx xx xxxx xxxxxxxxx xxxxxxxxxx xx xxxxxxx xxxxxx xxxxxxxxxxx xxx xxx xxxxxxxxx xx xxx xxxxxxxx xxxxxx xx xxxxxxxxxxxx xx% xxx xx% xxxxxxxx xx xxxx xxxxxx.

More from the Commission’s assessment

xxx xxxxxxxxxxxxxxx xx xxx xxxxxxxx xxxxxx xx xxxxxxx xx xx xxxxxxxx xxxxxxx x xxxxxxxxxxx xxxxxxxx xx xxx xxx xx xxxxxxxxx xxxxxx (xx xx xx% xx xxxxxxxxx xxxxxx xx xxxxxxxxx’ xxxxx xxxxxx xxxxxxxxxxx xx xxxx). xxx xxxxxxxxx xx xxx xxxxx xxxx xx xxxxxxxxx xx x xxxxx xxxxxxxxxxxx xx xxxxxxxx xxx xxxxxxxx xxxxxxxxx xxxxxxxxxxxxxx xx xxxxx xxxxxx xxx xxxxxxxx xxxxxxxxxxxxxx xx xxxxxxxxxx xxxxx xx xxxx.

xxx xxxxx xxxx xxx x xxxxxx xxxxx xx xxxxxxxxxx xxxxxxxxxx, xxxxxxxxx xxxxxxxx xxxxxxxxxx xxxxxxx, xxx xxxxxxxx xxxxxxxx xxxxxxxxxxx xx xxxxxxx xxxxxxxxxxx xx xxxxxxxx xxxxxxx xxxxxxxxx.

The Commission’s proposed improvements for Lithuania (5 points)

xx xxx xxxx xxxx, xxxxxxxxx xx xxxxxxx xx xxxx xxx xxxxxxx xx xxx xxxxxxxx xxxxxxxxxxxx xxxx xxxxxxxxxx xxx xxxxx xxxxxxx xx xxx xxxx xx xx xxxxxxxxx xx xx xxxxxxxx xxxx:

  1. xxxxxx xxxx xxx xxxxxxxx xxxxxxxxx xx xxxxxxxxxxx xxx xxxxxxxxx xxxx xxx xxxxxxxx xxxxxx xxxxxxxxxxx xxxxxxxxxxx xx xxx xxxxxxx xxxxxxxxx xx xxxxxxxxx x xxxxxxxxxxxx xxxxxxxx xxxxx xx xxxx xxx xxxxxxx xxx xxx xxx xxxxxxxx xxxxxxx xxx xxxx xxxxxxxxx xxxx xxx xxxx xxx xxxxxxxx xxxxxxx xx xxx xxxxxxxx xxxxxx.
  2. xxxxxx xxxx xxx xxxxxxxxxxx xxxxxxx xx xxxxxxx xxxxxx xxxxxxxxxxx xxx xxx xxxxxxxxx xxxxxxx xxxx xxx xxx xxxxxxxxx xxxxxxxxx xx xxxxx xxx xxxx xxxxxxxxxx xxxx xxx xxxx xxx xxxxxxx, xxxx xx xxxxxxxxxxx xxx xxxxxxxxx xx xxxxxxx xxxxxx xxxxxx xxx xxxxxxxx xxxxxxx.
  3. xxxxxxx xxxxx xxxxxxxx xxxxxxxx xxx xxxxxxxx xxxx xxxxxxxxxxx xxxxxxx xxx xxxxx xxxxxxxxxx xxxxxxxx xxxxxxxx xxxxx xxxx.
  4. xxxxxxxx xxx xxxxxxxxxxxx xx xxx xxxxx’x xxxxxx xxxxxxxxxx xxxxxx xx xxxxxxxxxx xxxx xxxxxxx x xx xxxxxxxxx (xx) xxxx/xxxx xxxxxxxxxxxx xx xxx xxxxxxxx xxxxx’x xxxxxxxxxx.
  5. xxxxxxx xxx xxx xxxxxxxxxx xxx xxx xxxxxx xxxxxxx xxxx xxxxxxxx xx xxx xxxxx xxxx xxxxx xxxx xxx xxxxxxxxxxxxxxxx xxxxxxxxxx xx xxxxxxx x(xx) xx xxxxxxxxx (xx) xxxx/xxx. xxx xxxxxxxx xxxxxxxxx xxxxxxxxx xxx xxxxxxxxx xxxxxx xxxxxxxx xx xxx xxxxxxxxxxx xx xxxxxx xxxxxxx.

xxxx xxx xxxxxxxxxx’x xxxxxxxx (xxx)

Using this page

All answers are up to date as of 29 October 2026. See what changed

How to cite this page: Renovate Europe EPBD Tracker: Lithuania, updated 29 October 2026, https://renovate-europe.eu/epbd-tracker/lithuania/

Terms such as MEPS, renovation passport or zero-emission building are explained in the EPBD glossary.

About the Renovate Europe EPBD Tracker