Slovenia

In short

Slovenia has submitted its draft National Building Renovation Plan, has an open national register of energy performance certificates and is developing a building framework based on Level(s). Next come the final plan in December 2026 and its new Energy Efficiency Act. Binding thresholds for zero-emission buildings and minimum energy performance standards are still needed.

Slovenia’s progress on the EPBD

Steps Slovenia has already taken and the obstacles ahead.

Progress unlocked

  • Draft NBRP submitted
  • xxxxxxxxxxx xxxxxxx xx x xxxxxxxx xxxxxxxxx xxxxx xx xxxxx(x).
  • xxxxxxxxxxx xxxxxxxx xxx/xxxx-xxxx xxxxxxxx

Obstacles ahead

  • Define binding ZEB and MEPS thresholds and a complete residential trajectory.
  • x xxxxxxx xx xxxxx xxx xxxxxx-xxxx xx xxxxxxxxx xx xxxx.
  • xxxxxxxxxxxxx xx x xxxxxxxxxxxxx xxx-xxxx xxxx xxxxxxx.

What comes next for Slovenia

The next deadlines and the measures not yet published.

Next checkpoint

xxxxxxxx xxxx: xxxxxxxxxx xx xxxxx xxxx.

Awaiting release

xxxx xxxxxxx – xxxxxxxx xx xxx xxxx-x (xxxxxx xxxxxxxxxx xxx), xxxxxxxxxxx xxx xxxx xxxxxxxxxx.

Log in to read this section

This section is open to Renovate Europe partners, and to policymakers, media and public authorities with a reader account.

Topic by topic

Open a topic to see the answer, the sources and what the EPBD requires.

Coordinating ministry

xxx xxxxxxxx xx xxxxxxxxxxxxxx xxx xxxxxx xxxxx xxxxxx-xxxxxxxxxx xxx xxxx xxxx xxxxxxx xxx xxxxxxxxxxx xxx xxxxxx. xxx xxxxxxxx xx xxxxxxx xxxxxxxxx xxx xxxxxxx xxxxxxxx xx xxxxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxxxx. xxx xxxxx, xxx xxxxxxxx xxxxxxxxxxxxx xxxxxx xxxx, xxx xxxxxxxxxxxxxx xxx xxxxxxx xx xxxxxxx, xxxxxx xxx xxxxxxxx.

Map the stock

Building databasexxx xxxxxxxx xxx xxxxxxxx xx xxxxxxxxxxx. xxx xxxxxxxx xxxxxxxx xx xxxxx xxxxxxxxxxx.

A national database on the energy performance of individual buildings and of the whole building stock. EPBD Article 22 Glossary

Status
xxx xxxxxxxx xxx xxxxxxxx xx xxxxxxxxxxx. xxx xxxxxxxx xxxxxxxx xx xxxxx xxxxxxxxxxx.

xxxxxxxx xxxxxxxx x xxxxxxxx xxxxxxxx xx xxxxxx xxxx xxxxx xxxx. xxx x-xxxxxxx (xxxxxxx xxxxxxxxxxx xxxxxx) xx xxx xxxxxxx xxxxxx xxx xxx xxxxxxx xxx xxxx xxxxxx xxxx, xxxxxxxxx xxx xxxxxxxx xxxxxxxx. xxx xxxxxxxx xxxxxxxxx xxxxxxxx xxxxxxx xx xxxx xxxx, xxxxxxxxxx xxxxxxxxxxxx xxx xxxxxxx xxxxxxx xxx xxxxxx xxxxxxxx-xxxxxxxxxxx xxxxxx, xxx xxxxxxxxxx xxxxxxxxxxxxx xxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxxxx. xxx xxxxxxxx xxxxxxxxx xxx xxxxxxxx; xxxxxxxx xxxxxxxxxxx xxx xxxxxxx xxxxx xxx xxxxx xxxxxxxxxxxx. xxxxxx, xxxxxxxxxxx xxxxxx xxx xxxxxxx xxx xxx xxxxxxxxxxx, xxxxx xxx xxxxxx xxx xxxxxxx xxxxxxxx-xxxxxx xxxxxxxxxxx xxx xxxx xxxxxxxx. xxxxxxxxxxx, xxxxxxxxx xxx xxxxxx-xxxxxxxx xxxxxxxx xxx xxxxxxx xx xxxxx xxxxxxxxxx xxxxxx xxxxxx.

The database includes

  • xxx xxxx
  • xxxxxxxx xxxx / xxx
  • xxxxx xxxx
  • xxxxxxxxxxxx xxxxxx / xxx
  • xxxxxxx xxxxxx xxx
  • xxxxx xxxxxx xxx
  • xxxxxxxxxx xxx xxxxxxxxx
  • xxxxxxx xxxxxx / xxxx xxxx
  • xxxxxxxxx xxxxxx xxxxxxxxxxxxx
  • xxxxx-xxxxxxxxxx xxxxxxxxx

Who can access it

  • xxxxxxxx xxxxxxxxxx
  • xxxxxxxxxx xx xxxxxxxx xxxxxxxxxxxx

Sources

  • xxxxxxxxxx xxxxxx: xxxxxxxx xx xxxxxx xxxxxxxxxxx xxxxxxxxxxxx
  • xxxx xxxx xxxx: xxxxxxxx xx xxxxxx xxxxxxxxxxx xxxxxxxxxxxx
  • xxxxx: xxx xxxxxxxx
  • xxxxxxxxx xxx xxxxxxx xxxxxxxxx: x-xxxxxxx xxxxxx
Calculation methodxxxxxxx xxxxxx xxxxxxx

The national method for calculating the energy performance of buildings, on which energy performance certificates and minimum requirements are based. EPBD Article 4 and Annex I Glossary

Status
xxxxxxx xxxxxx xxxxxxx
Harmonised across the country
xxx

xxxxxxxx’x xxxxxxxxxxx xxx xxxxxxxxxxx xxx xxxxxx xxxxxxxxxxx xx xxxxxxxxx xx xxx xxx xx xxx xxxxxxxx xxxxxx-xxxxxxxxxx xxxxxxxxxx (xxxxx-x) xxx xxx xxxxxxxxxxxx xxxxxxxxx xxxxxxxxx, xxx-x-xxx:xxxx. xxxxx-x xxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxxx, xxxxxx-xxxxxxxxxxx xxxxxxxxxx, xxxxxxx-xxxxxx xxxxxxxxxx xxxxxxx xxx xxxxxxxxx xxxxxxxxxx. xxx-x-xxx:xxxx xxxxxxxx xxxxxxxx xxxxxxxxxxx xxxxxxxxxx xxx xxxxxxxxxx xx xxxxxxxx xxxxxxxxx.

xxxxx-x xxx xxxxxxx xx xxxxxxxx xxxx xx xxxxxxxxxxx xxxx xxxxxxxx xx xxx xxxxxxxxxxx, xxxx xx xxxxxxx xxxxxx xxxxxxxxxx xxxxxxx xxx xxxxxxxxx, xxx-xxxxxxxxx xxx xxxxx xxxxxxx xxxxxx; xx xxx xxxxxxxxxxx xx xxxxx xxxxxxxxxx xxxxxx xxxxxxx xxxxxx xxxxxxx xxx xxxxxxxx xxxxxxx xxx xxxxxxx xxxxxxxx.

Sources

  • xxxxx: xxxxxxxxxx xxxxxxxxx
  • xxx.xx: xxxxxxxxxxxx
  • xxxxx: xxx xxxxxxxx
Energy performance certificatesxxxxxx xxxxx xxxxxxxxxxx

A certificate rating a building’s energy performance on a scale from A to G, with recommendations to improve it. EPBD Articles 19 to 21 Glossary

Status of the EPC reform
xxxxxx xxxxx xxxxxxxxxxx

xxxxxxxx xxx xx xxxxxxxxxxx xxxxxxxx xxx xxxxxx xxxxx xxxx. xxx xxxxxxxxxx xx xxx xxxxxxxxxxx xxx xxxxxxxxx xxx xxxxxxx xxxxxxxx xxxxxx xxxxxxxxxxx xxxxxxxxxxxx (xxxxxxxxx) xxxxxxxxxxx xxxxxxxxxxx xxxxx, xxxxxxxxxx, xxxxxxxxxxxx xxxxxxxxxxxx, xxxxxxxxxxx xxxxxxxxxxx, xxxxxx xxxxxxx xxxxxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxxxxx.

xxx xxxxx xxxxxx xxxxxxxxxx xxx (xxxx-x) xxxxxxxx xx xxx xxxxxx xxxxx xxxxxxxx: xxx x-x xxxxxxx, xxxx x+ xxxxxxxxxxxx xxx xxx x xxxxx-xxxxxxxxxx xxxxxxxxx; x xx xxxx xxxxxxxx; xxxxxxx xxxxxx (xxx xxxxxxxxxxxx, xxxxx xxxxxxxxxx, xxxx, xxx xxxxxx xxx xxxxx xxxxxxx); xxx xxxxxxxxxx xxxxxxxxxxxxxxx (xxxxxxxxx xxx xxx xxxxxxxxx xxxxxx xxxxxxxx).

Challenges

  • xxxx xxxxxxx
  • xxxx xxx xxxxxxxx xxxxxx
  • xxxx xxxxxxxxxxxxxxx
  • xxxx xxxxxxxxxxx
  • xxx xxxxxxxxxxxx xxxxxx xx xxxxxxxxxx xxxxxxx

Sources

  • x-xxxxxx: xxx xxxxxxxx (xxx)
  • xxxx: xxxxxx xxxxxxxxxxx xxxxxxxxxxx xxxxxx

Plan the route

National Building Renovation Planxxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxxxxx

Each Member State’s plan to renovate its national building stock into a highly energy-efficient and decarbonised building stock by 2050, with targets for 2030, 2040 and 2050. EPBD Article 3 and Annex II Glossary

Status
xxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxxxxx

xxxxxxxx xxxxxxxxx xxx xxxxx xxxx xx xxx xxxxxxxx xxxxxxxxxx xx x xxxxxxx xxxx.

Sources, including the draft plan

  • xxxxxxxx xxxxxxxxxx: xxxxxxxx xxxxxxxx xxxxxxxxxx xxxxx
  • xxxxxxxx xxxxxxxxxx: xxxxxxxx xx xxx xxxxx xxxx (xxx)
Renovation passportxxxxxx xxxxx xxxxxxxxxxx

A tailored, step-by-step plan for the deep renovation of a specific building, prepared by a qualified expert. EPBD Article 12 Glossary

Status
xxxxxx xxxxx xxxxxxxxxxx

xxx xxxxx xxxxxx xxxxxxxxxx xxx (xxxx-x) xxxxxxxx x xxxxxxxx xxxxxx xxx xxxxxxxxxx xxxxxxxxx xx xxxxxxxx. xxx xxxx xxxxxxxxxx xxxx, xxx xxxxxxxx xxxxx xxxxxxxx:

– xxxxxxx- xxx xxxxx-xxxxxx xxxxxxx.

– xxxxxxxxxx xx xxxxxxxxxxx xxxxxxxxxx xxx xxxxxxxxx.

– xxxxxx-xxxx xxxxxxx.

– xxx xxx xxxxx xxxxxxxx xxxxx xxxxxxxxxx.

xx xxxxx xxxx xxxxxxx xxxxxxxxx xxxxxxxx xxxxxxx xxxxxxxxxxx, xxxxxxxxx xxxxxx xxxxxxxxxx xxx xxxx-xxxxxxxxxxx, xxxxx xxxxxxxx xxxxxxxx, xxxxxxxxx xxxxxxx xxx xxxxx xx xxx-xxxx-xxxx xxxxxxxx xxxxxxxx.

How it is or will be designed

  • xxxxxxxxx
  • xxxxx-xxxxxx
  • xxxxx xx xx xx-xxxx xxxxxxxxxx
  • xxxxxxx
  • xxxxxx xx xxxx

Who can issue it

xxx xxxxxxx

Sources

  • xxx.xx: xxxxxxxxxx xxxxxxxx (xxx)

Set the standards

Zero-emission buildingsxxxxxxxxxx xxxxxxx xx xxxx

A building with a very high energy performance that needs zero or a very low amount of energy, produces no on-site carbon emissions from fossil fuels and zero or very low operational greenhouse gas emissions. EPBD Article 7(1), Article 11 Glossary

Status of the definition
xxxxxxxxxx xxxxxxx xx xxxx
Ready for the EPBD deadlines for new buildings
xxx
Used as a benchmark for deep renovation
xxxxxx

xxxxxxxx xxxxxxx xxx x xxxxxxxx xxx xxxxxxxxxxx xxxxxxxxx xxx xxxxxx xxxx-xxxxxx xxxxxxxxx (xxxxxx xxxxxxxxxxxxx xxxxxx, xx xxxx) xxxxx xxxxx-x xxx xxx-x-xxx:xxxx. xxx xxxxxxxxxx xxxxxxx xxxxxx xxxxxxxxxx xx x xxxxxxx xxxx, xxxxxxxxxx xxxxxxx-xxxxxx xxxxxxxxxxxx xxx xxxxxxxxx-xxxxxx xxxxxxxxxxxx.

xxx xxxxxxxxx xxxxxx xxxxxxxxx xxx (xxxxxx-x), xxxxxxx xx xxxxxxxx xxxx, xxxxxxxxxx x xxxxxxxxx xxxxxxxxxx xx xxxx-xxxxxxxx xxxxxxxxx.

xx xxxx, xxx xxxxxxxxxx xxxxxxxx x xxx xxxxxx xxxxxxxxxx xxx (xxxx-x), xxxxx xxxxxxxxxxx xxx xxxxx xxxxxxxxx xxx xxx, xxxxxxxxx xxxxxxxxxx, x xxxxxxx xx% xxxxxxxxxxx xxxx xxxx xxxxxxx-xxxxxx xxxxxxxxxx, xxx xxxxxxxxx xxx xxxxxxxxx xxx xxx xxxxxxxxx xxxx xxxx xxx xxxx.

xxx xxxxxxxxxx xxxxxxxx xx xxxx xxx xxxxx xxxxxxxxx xxxx xxxxxxxxx €xx xxxxxxx xxx xxxx-xxxxxxxx xxxxxxxxx xxxxx xxx xxxxxxx xxxxxx xxxx.

Sources

  • x-xxxxxx: xxx xxxxxxxx (xxx)
MEPS and trajectories for residential buildingsxxx-xxxxxxxxxxx xxxxxxxxx: xxxxxxxxxxxx xxxxx xxxxxxxxxxxxxxxxxxxxxx xxxxxxxxx: xxxxxxxxxxxx xxxxx xxxxxxxxxxx

Rules that require non-residential buildings to meet a minimum energy performance by set dates, starting with the 16% worst-performing by 2030 and the 26% by 2033. EPBD Article 9(1) Glossary

Each Member State’s national trajectory to reduce the average primary energy use of residential buildings by at least 16% by 2030 and 20 to 22% by 2035, compared with 2020. EPBD Article 9(2) Glossary

Non-residential buildings
xxxxxxxxxxxx xxxxx xxxxxxxxxxx
Residential buildings
xxxxxxxxxxxx xxxxx xxxxxxxxxxx

xxx xxxxx xxxxxx xxxxxxxxxx xxx (xxxx-x) xxxxxxxxxx xxx xxxxxxx x xx xxx xxxx.

xxx-xxxxxxxxxxx xxxx: xxx xxxxx xxxxxxxx xxxxxxxxx xxxxxxxxx xx xx% xxxxxxxxxxxxx xx xxx xxxxx-xxxxxxxxxx xxxxxxxxx xx xxxx xxx xx% xxxx xxxx. xxx xxxxxxxx xxxxxxxxxx xxx xxxxxxxxx xxx xxxxxxx xxxxxx-xxxxxxxxxxx xxxxxxxxxx. xxxxxxxxxx xxx xxxxxxxxx xxxxxxx xxxxxxxxxx xx xxxxxxx xxx xxxxx xxxxxx xxxxxxxxxxx – xxx xxxxxxxxxx xxxx xx xxxxxxxxxx xx x xxxxx xxxxx. xxxxxxxxxx xxx xxxxxxx xxx xxxxxxxx xxxxxxxxx, xxxxxxxxx xxxxxxxxxx, xxxxxxx xxxxxxxxx, xxxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxxx, xxxxxxxxxx xxxxxxxxx xxxxxxx xxxx xxxx.

xxxxxxxxxxx xxxxxxxx xxxxxxxxxx xxxxxxxxxx: xxx xxxxx xxxxxxxx x xxxxxxxx xxxxxxxxxx xxx xxxxxxxx xxxxxxx xxxxxxx-xxxxxx xxxxxxxxxxx xxxxxx xxxxxxxx’x xxxxxxxxxxx xxxxxxxx xxxxx. xx xxxx, xxx xxxxxx xx xx xxxxxx xxxxxxx xxxxxxx-xxxxxx xxxxxxxxxxx xx xxx xxxxxxxxxxx xxxxxxxx xxxxx xx xx xxxxx xx% xxxxxxxx xxxx xxxx. xx xxxx, xxxx xxxxxx xx xx xxxxxx xx xx xx xxxxx xx% xxxxxxxx xxxx xxxx. xxx xxxxx xxxx xxxx xxx xxxxxx xx xx xxxxx xx% xx xxx xxxxxxxxx xx xxxxxxx xxxxxxx-xxxxxx xxxxxxxxxxx xxxx xx xxxxxxxx xxxxxxx xxxxxxxxxx xx xxx xx% xxxxx-xxxxxxxxxx xxxxxxxxxxx xxxxxxxxx.

xxxx-x xxxx xxxxxxxx xx xxxxxxxxxxx xxxxxxxxxx xxxx xxxxxx-xxxx xxx xxxxx xxxxx xx%. xx xxxxxxxxxxx x xxxxxxxxxxx xxxxxxxxx xxxxxx xx xxx xxxxx xx xxxxxx-xxxx xxxxxx xxxxxxxxxxx xx xxxxxxxxxxx xxxxxxxxx. xxxx xxxx xxxxx xxxxx xxxxx xx%, xxx xxxxxxxxx xxxxx xxx x xxxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxx xx xxxxxx xxxxxxxxxx xx xxxxxxx xxxxxxx-xxxxxx xxxxxxxxxxx xxxxxxx xxxx xxx xxxx.

Coverage

  • xxx-xxxxxxxxxxx xxxxxxxxx
  • xxxxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxx
  • xxxxx-xxxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxxxx

Sources

  • x-xxxxxx: xxx xxxxxxxx (xxx)

Activate smart performance

Technical building systemsxxxxx xxxxxxx xxxxxxxxxxxx xxxxxxxxx

A building’s equipment for heating, cooling, ventilation, hot water, built-in lighting, automation, on-site renewables and storage. EPBD Article 13 Glossary

Status
xxxxx xxxxxxx xxxxxxxxxxxx xxxxxxxxx
Checks required after installation
xxxxxx

xxx xxxxxxxx xxxxx-x xxxxxxxxxx xxxxxxxxx xxxxxxxxx xxxxxxxx xxxxxxx, xxxxxxxxx xxxxxxx, xxxxxxx, xxxxxxxxxxx, xxxxxxxx xxx xxxxx, xxxxxxxx, xxxxxxxxxx xxx xxxxxxxxx-xxxxxx xxxxxxxxxxx. xxxxxxxxx xxxxxxxxxx xxx xxxxxxxxx xx xxx-x-xxx:xxxx.

xxx xxxxx xxxxxx xxxxxxxxxx xxx (xxxx-x) xxxxxxxx xxxxxxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxxxxx xxxx xxxxxxxxx, xxxxxxxx xx xxxxxxxx:

– xxxxxx xxxxxxxxxxxx, xxxxxxxxxxx xxxxxx, xxxxxxxxxx xxx xxxxxxxxxxx xxxxxxx.

– xxxxxx-xxxxxx xxxxxxxxxxxx xxxx xxxxxxx xxx xxxxx xxxxxxxxx, xxxxx xxxxxxxx xx xxxxxxxxxxxxx xxxxxxxx, xxxxxxx xx xxxxxxxxx, xxxxxxxx xx xxxxxxxxxx xxxxxxxxxxx.

– xxxxxxxxxx xx xxx xxxxxx xxxxxxxxxxx xx xxx xxxxxxxx xxxxxx.

– xxxxxxxxxxxxx xx xxx xxxxxx’x xxxxxx xxxxxxxxxxx, xxxxxxxx xx xxx xxxxxxxx xxxxx.

– xxxxxxxxxxxx xxxxxxxxx xxxxxxxx xx xxxxxxxxxxxx.

– xxxxxxxxx xx xxxxxxxx xxxxxx xxxxxxxxxxxxx xxxxxx xxxxxxxxx.

– xxxxxxxxxxx xxxxx xxxxxxxx xxxxxxxx xxxxxxxxx xxxxxxxxxxxxxx, xxxxxxxxx xxxxxxxxx xxxxxxxxx.

Systems covered

  • xxxxxxx
  • xxxxxxx
  • xxxxxxxxxxx
  • xxxxxxxx xxx xxxxx
  • xxxxxxxx
  • xxxxxxxx xxxxxxxxxx xxx xxxxxxx
  • xx-xxxx xxxxxxxxx xxxxxx
  • xxxx xxxxx
  • xxxxxxxx xxxxxxx xxx xxxxxxx xxxxxxxxxx

Sources

  • x-xxxxxx: xxx xxxxxxxx (xxx)
  • xxxxxxxxxx xxxxxx: xxxxxxxx xxx xxxxxxxxxxx xxxxxxxx xxxxxx xxxxxxxxxxx
Automation and control (BACS)xxxxxxxxxxxx xxxxx xxxxxxxxxxx, xxxxx xxxxxxxxx

Software and controls that run a building’s heating, cooling, ventilation and lighting automatically and efficiently. EPBD Article 13(9) to (12) Glossary

Status
xxxxxxxxxxxx xxxxx xxxxxxxxxxx, xxxxx xxxxxxxxx
Requirements for non-residential buildings include
xxx
Aligned with the EPBD deadlines
xxxxxx xxxxxxx

xxx xxxxx xxxxxx xxxxxxxxxx xxx (xxxx-x) xxxxxxxxxx xx xxxxxxxxxx xxx xxx-xxxxxxxxxxx xxxxxxxxx xxxx xxxxxxx, xxxxxxx xx xxxxxxxx xxxxxxxxxxx xxxxxxx xx xx xxxxxxxx xxxx xxxxxxxx xxxxxxxxxx xxx xxxxxxx xxxxxxx. xxx xxxxxxxx xxxxxxxxxxxxx xxxxxxxx xxxxxxxxxx xxxxxx xxxxxxxxxx, xxxxxxxxxxxx, xxxxxxxxxxxxxx xx xxxxxxxxxx xxxxxx, xxxxxxxxxxxxx xx xxxxxxxx xxxxxxxx xxx xxxxxxxxxxxxxxxx xxxxxxx xxxxxxx xxxx xxxxxxxxx xxxxxxxxxxxxx.

xx xxxxxxx xxxxxx xxxxxxxx xxxxxxxxx xx xxxxxxxxx xx xxx xxxx.

xxxx-x xxxxxxxx xxx-xxxxxxxxxxx xxxxxxxxx xx xxxx xxxxxxxxx xxxxxxxx xxxxxxxx xxxxxxx xx xxxxxxxxx xxxxxxxxx.

Buildings covered

xxxxxxx

Sources

  • xxxxxxxxxx xxxxxx: xxxxxxxx xxx xxxxxxxxxxx xxxxxxxx xxxxxx xxxxxxxxxxx
  • x-xxxxxx: xxx xxxxxxxx (xxx)
Indoor environmental qualityxxxxxxxxxxx xxxxxxxxxxxx, xxxxx xxxxxx xxxxxxxxx

The conditions inside a building that affect people’s health and wellbeing, such as temperature, humidity, ventilation and pollutants. EPBD Article 13(4) Glossary

Requirements in national rules
xxxxxxxxxxx xxxxxxxxxxxx, xxxxx xxxxxx xxxxxxxxx
Linked to renovation or upgrades
xxx

xxxxxxxx xxxxxxx xxx xxxxxxx xxxxxxx xxxxxxxxxxxx xxxxxxxx xxxxxx xxxxxxxxxxxxx xxxxxxx (xxx), xxxxxxxxx xxxxxxxxxxx, xxxxxx xxx xxxxxxx, xxxxxxx xxxxxxx, xxxxxxxx, xxxxxxxx xxxxxxxxxx xxx xxxxx.

xxx xxxxxxxxxx xx xxxxxxxxxxx xxx xxx xxxxxxxxxxxx xx xxxxxxxxx (xxxxx-x), xxxxxxx xx xxxx xxxxxxxxx xxxxxx xxx, xxxxxxxxxxx, xxxxxxx xxxxxxx, xxxxxxxx, xxxxxxxx, xxxxxxxxxxx xxx xxxxxxxxx.

xxx xxxxxxxxxx xx xxxxxxxxxx xxxxxxx xxxxx xx xxxxxxxxx (xxxx) xxx xxx xxxxxxxxxx xx xxxxxxxxxx xx xxxxxxxxx xxxxxxx xxxxxxxx (xxxx) xxxxxxx xxxxxxxx xxxxxxx, xxxxxx xxxxx xxxxxxxxxx, xxxxxxxx xxxxxxx xxx xxxxx xxxxxxxxxx.

xxx xxxxx xxxxxx xxxxxxxxxx xxx (xxxx-x) xxxxxx xx xxx xxxxxxxx xx xxxx xxxxxxx xxxxxx xxxxxxxxxxxxx xxxxxxxxxx xxx xxx-xxxxxxxxxx xxxxxx-xxxxxxxxxxx xxxxxxxxx.

xx xxxxxxxx xxxx-xxxxxxxx xxx-xxxxxxxxxxx xxxxxxxxx xx xxxx xxxxxxxxxxx xxx xxxxxxx xxxxxxx xxx xxxxxxxxxx xxx xxxxxxxxxx xxxxxx xxx xxxxxxx.

Elements covered

  • xxxxxx xxx xxxxxxx
  • xxxxxxxxxxx
  • xxxxxxx xxxxxxx
  • xxxxxxxx
  • xxxxxxxx
  • xxxxxxxxxxx xxxx
  • xxxxxxxx xxxxxxx
  • xxxxxxxxxxxx xxx xxxxxxx xx xxxxxx xxxxxxxxx

Main concern

xxxxxxxxxx xxx xxxxxxxxxxxxx xxx xxxxxxxx xxxx-xxxxxxxxxx xxxxxxx, xxxxxxxxxx xxxxxxxxxxx xxx xxxxxxxxxxx xxxxxxxxxx xx xxx xxxxxxxx xxxxx, xxxxxxxx xxxxxxxxxxx xxx x xxxxxxxxx xxxxxxxxxx xxxxxxx xxx, xxxx, xxxxxxxxxx xxxxxxxxx, xxxx xxx xxxxxxx xxxxxxxxxx.

Promising move

xxxxx xxxx xxxxxxxxxx xxx xxxxxxxxxx xxx xxxxxx xxxxxx xxx xxxxxxx xxxxxxxxxxxxxx xx xxx xxxxxxxx xxxxxx-xxxxxxxxxxx xxxxxxxxx. xxxx xxxxxxxxxx xxxxxxxx xx xxxxxxxx xx xxxxxxxxx xx xxxxx xxxxxxxxxxxx xxx xxxxxxxxxxx xxxxxxx xxxx.

xxxxx.xx

xxxxx.xx

Sources

  • xxxxx: xxxxxxxxxx xxxxxxxxx
  • x-xxxxxx: xxx xxxxxxxx (xxx)
Smart readiness indicatorxxxx xxxxx

An optional EU rating of how well a building can adapt its operation to the needs of its occupants and of the grid, and improve its efficiency. EPBD Article 15 Glossary

Status
xxxx xxxxx

xxxxxxxx xx xxxxxxx xx xxxxxxxx xxxxxxxx xxx xxxx xxxxx xxx xx xxx xxxxxxxxx xxxxxxxx xxxx xxx xxxxx xxxxxx xxxxxxxxx xxx xxxxx. xx xxxxxx xx xxxxx xx xxxxxxxxxxxxxx xxxxxxxxx xxxxxx xxxxxxxxxx, xxxx xxx xxxx xxx xxxxxxxx xxxxxxxx xxxxxxxxx.

Building types covered

xxxxxxx

Sources

  • xxxxxxxx xxxxxxxxxx: xxx xx xx xxxxxxxxx

Cut the carbon

Whole-life carbonxxxxxxxxxxx, xxxxxxx xx xxxxx xxxxx xxxxxxxxxxx

All the greenhouse gas emissions of a building over its life: making and transporting materials, construction, energy use, replacements and demolition. EPBD Article 7(2) and (5) Glossary

Status
xxxxxxxxxxx, xxxxxxx xx xxxxx xxxxx xxxxxxxxxxx

xxxxxxxx xx xxxxxxxxxx x xxxxxxxx xxxxxxxxxxx-xxxxxxxx xxxxxxxxx xxx xxxxxxxxxx xxxxxxxxx xxxxx xx xxxxx(x), xxxxxxxxx xx xxxxx xxx xxxxx xxxxxxx. xxxxxx xxxxxxxxxxxxxx xxx xxxxxx xxxxxxxxx xxx xx xxxxxxx xxxxx.

Steps taken

  • xxxxx xxxx xx x xxxxxxxx xxxxxxxxxxx xxxxxx.
  • xxxxxx xxxxxxxxx xx xxxxxx xxxxxxxxxxx xxxxxxx xxxxxxx xxxxx-xxxx xxxxxx xxxxxxxxxxxx.
  • xxxxx xxx xxxxx xxxxxxxx.

Sources

  • xxx.xx: xxx xxxxxxxxx xxx xxxxxxxxxxx xxxxxxxxx
  • xxx.xx: xxxxxxxxxxxx
  • xxxxxxxx xxxxxxxxxx: xxxxxxxx xx xxx xxxxx xxxx (xxx)
Phasing out fossil fuelsxxxxxxxxx xxxxxxxxxx xxx xxx xxxxx-xxxxx xxxxxx-xxxx xxxxxxx xxxx xxxxx

Since 1 January 2025, Member States can no longer offer financial incentives for installing stand-alone boilers powered by fossil fuels, and they must plan the phase-out of fossil-fuel boilers. EPBD Article 13(7), Article 17(15) Glossary

Financial incentives for new stand-alone fossil-fuel boilers ended
xxx
National pathway to phase out fossil fuels in heating and cooling
xx xxxxxxxxxxx
Oil boilers in new buildings
xxx
Oil boilers in existing buildings
xx xxx xxxxxxxxxx
Gas boilers in new buildings
xxx xx xxxxxxx-xxx xxx xxx xxxxxxx (xxxxx xxxx)
Gas boilers in existing buildings
xx xxx xxxxxxxxxx
Coal heating
xxx xxx xxx xxxxxxxxx
Stand-alone fossil-fuel boilers
xxxxxxxxx xxxxxxxxxx xxxxxxxxxx (xx xxxxxxxxxxxx xxx)
Fossil-fuel connections in new buildings
xxxxxxxxxxx

xxxxxx xxxxxxx xx xxxxxxxx xx xxxxxxxxxx, xxxx xxxxx xxx xxxxxxxxx-xxxxxx xxxxxxx xxxxxx xxxx xxx xxxxx-xxxxx xxxxxx xxxxxxx.

xxxxx x xxxxxxx xxxx, xxxxxxxx xxx xxxxxxxxx xxxxxxxx xx xxxxxxxxxx xxx, xxxxx-xxxx-xxx xxx xxxx xxxxxxx xx xxx xxxxxxxxx. x xxxxxxxx, xxxxxxxxx xxxxxxx xx xxxxx xxx xxxxxx xxxxxxx xx xxxx xx xxxxx xx xxxxxxxxxxx.

Promising move

xxx xxxx xxxxxxxxxxx xxx xxx xxx xxxx xxxxxxx xx xxx xxxxxxxxx, xxxxxxxx xxxx xxx xxxxx xxxxxxx xxx xxxx xxxxx xxx xxxxxxxxxx, xxxxxxxx x xxxxx xxxxxx xxxxxx.

xxxxx.xx

xxxxxxxx.xx

Sources

  • xxxxx: xxx xxxxxxxx
  • xxx xxxx: xxxxxx xxxx xxxxxx-xxxx, xxxxxx xxx xxxxxx xxxxxxxxxx xxx xxxxxxxxxx xx xxxxxxxxx
  • xxx.xx: xxxxxxxx xxxxx xxx xxxx xxxxxx-xxxxxxxxx xxxxxxxxx

Enable delivery

Financing renovationsxxxxxxxxx xx xxxxxx xx xxxxxxxxxx xxxxx xx xxxxxx xxxxxxxxxxx

The grants, loans, tax breaks and other support Member States give for renovation, which must be linked to the energy savings targeted or achieved. EPBD Article 17 Glossary

Linked to renovation depth or energy performance
xxx
Measures for vulnerable and energy-poor households
xxx

xxx xxxxx xxx xx-xxxxxxxxx xxxxxxxxxx xxxxxxx xxxxxx, xxxxxxxxx, xxxxxxxxxxxx xxx xxxx-xxxxxxxx xxxxxxxxxx xxxxx, xxxxxxx xxxxxxx xxx xxxxxx-xxxxxxxxxxx xxxxxxxxxxx. xxxxxx xxxxx xxxxxxxxxx, xxxxxxxxxx xxxxxxxxxx, xxxxxxxxx xxxxxxxxx, xxxx xxx xxxxxx xxxxxxxxx. xxxxxxxxx xxxxxxxxxxx xxxxx xxxxxxx xx xxxxxx xxxxxxxxxxx, xxx xxxxxx-xxxxxxx xxxxxxxxxx xxx xxxxx xxx xxxx xxxxxxxx xxxx xxxx xxxxxxxxxxxx xxxxxxx.

National financing instruments

  • xxxxxx
  • xxxxxxxxx
  • xxx-xxxxxxxx xxxxx
  • xxxx-xxxxxxxx xxxxx
  • xxxxxxxxxx xxxxx
  • xxxxxxx xxxxxxx
  • xxxxx-xxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxxxx xxxxxxxxxxx
  • xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx
  • xxxxxxx xxx xxxxx-xxxxxxxxx xxxxxxxxx
  • xxxxxxx xxx xxxx
  • xxxxxxx xxx xxxxxx xxxxxxxxx

Promising move

xxx xxxxxxxxxxx xx x xxxx-xxxxxxxx xxxxxxx-xxxx xxxx xxx xxxxxxx xxx xxxxx xxxxx-xxxxxxxxx xxxxxxxxx xxxxxxxxx xxxxxxxxxx xxxxxxx xxxxxxxx. xxx xxxxxxxxxx xxxxxxxxxx, xxx% xxxxxx xxxx x xxxxxxxxxxx xxx xxxx xxxxxxx xxxxxxxxxxx xxxx xx xxxxxxxxxxxxx xxxxxxxxxx.

xxxxxxxx.xx

xxxxxxxx.xx

Sources

  • xxx xxxx: xxxxxx xxxxx xxx xxxxxx xxx xxxxx
  • xxx xxxx: xxxxxxxx xxx xxxxxxxxx xxxx xxxx (xxx)
  • xxx xxxx: xxx% xxxxx xxx xxx-xxxxxx xxxxxxxxxx
  • xxx xxxx: xxxxxxxx-xxxx xxxx xxx xxxxx xxx xxxxxxxxxx xxxxx xxxxxxxxx xxxxxxxxx
One-stop shopsxxxxxxxx xx xxxxxxx xxxxxxxxxx xxxxxxx xxxxxxxxxxx

An advice centre that guides homeowners, businesses and public bodies through a renovation, from the technical options to financing. EPBD Article 18 Glossary

Status
xxxxxxxx xx xxxxxxx xxxxxxxxxx xxxxxxx xxxxxxxxxxx

xxxxxx xx x xxxxxxxxxx xxxxxx xxxxxx xxxxxxx xxxx xx xxxxx xxxxxxx xxx xx xxxxxxx xxxxxxxxxxx xxxxxxxx, xxxxxxxxx xxxx xxxxxxxxx xxx xxxxxxxxx xxxxxxxx.

Services provided

  • xxxxxxxxx xxxxxx
  • xxxxxxxxx xxxxxx
  • xxxxxxx xxxx xxxxx xx xxxx xxxxxxxxxxxx
  • xxxxxxxxxx xxxxxxx
  • xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx
  • xxxxxxx xxx xxxxx-xxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxx

Who runs them

  • xxxxxxxx xxxxxxxxxx
  • xxxxx xxxxxxxxxxx

Sources

  • xxx xxxx: xxxxxx xxxxxx xxxxxxx
  • xxx xxxx: xxxxx xxxxxx xxxxxx
  • xxx xxxx: xxxxxx xxxxxx xxxxxx xxxxxxxxx
  • xxx xxxx: xxx% xxxxx xxx xxx-xxxxxx xxxxxxxxxx
Skills and workforcexxxxxxx xxxxxxxxxxx xx xxxxxxxx xxxxx xxxxxxxxxxx

Education and training to build a skilled workforce able to deliver renovations at the scale needed. EPBD Article 17(12) Glossary

National skills or training initiative
xxxxxxx xxxxxxxxxxx xx xxxxxxxx xxxxx xxxxxxxxxxx
Workforce shortages a barrier
xxx, xxxxx xxxxxxx

xxxxxxxx xxx xxxxxx xxxxxxxxxxx xxx xxxxxxxxxxxx xxxxxxx, xxxxxxxxxx, xxxx-xxxx xxxxxxxxxxx, xxx xxxxxxx, xxxxxxxxx, xxxxxxxxx, xxxxx xxxxxxxxxxx, xxxxxxxx xxx xxxxxxxx xxxxxxxx. xxx xxx xxxxxxxxxxx-xxxxxxxx xxxxxx xxx xxxxx xxxxxx.

xxx xxxxx xxxx xxxx xxx xxx xxxxxxx x xxxxx xxxxxxxxxx xxxxxxxxx xxxx xxxxxxx xx xxxxxxxxxx xxxxxx.

Groups covered

  • xxxxxxxxxxxx xxxxxxx
  • xxxxxxxxxx
  • xxxx xxxx xxxxxxxxxx
  • xxxxxx xxxxxxxx
  • xxx xxxxxxxxx
  • xxxxxxxxxx
  • xxxxxxxxx
  • xxxxx xxxxxxxxxxx
  • xxx-xxxx xxxx xxxxxxxx
  • xxxxxxxx xxxxxxxx
  • xxxxxx xxxxxxx xxxxxxxxx

Topics covered

  • xxxx xxxxxxxxxx
  • xxxxxx xxxxxxxxxx xxxxx
  • xxxxxxxx xxxxxxxx
  • xxxx xxxxx
  • xxxxxxxxx xxxxxxx xxx xxxxxxx
  • xxxxx xxxxxx
  • xxxxxxxx xxxxxxxxxx xxx xxxxxxx
  • xxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxxxxxx xxxxxxx
  • xxxxx-xxxx xxxxxx
  • xxxxxx xxxxxxx / xxxxxx xxxxxxxxxx
  • xxxxxx xx xxxxxxxxxx

Sources

  • xxxxx xx: xxxxx xx xxxxxx xxxxxxxx, xxxxxx x
  • xxxxx xx: xxxxx xx xxxxxx xxxxxxxx
  • xxxxxxxx xxxxxxxxxx: xxx xx xx xxxxxxxxx
  • xxx.xx: xxx xxxxxxxxx xxx xxxxxxxxxxx xxxxxxxxx

Commission feedback on the draft renovation plan

xxxxxxxx xxxxxxxxxx, xx xxxx xxxx, xx xxx xxxxx xxxxxxxx xxxxxxxx xxxxxxxxxx xxxx xx xxxxxxxx.

The Commission’s overall assessment

xxxxxxxx xxxxxxxxx x xxxxxxxxx xxxxxxxx xxxxx xxxx xx x xxxxxxx xxxx. xxxx xxxxxx xxxxxxx xxxxxxxxx xxxxxxxx xxx xxxxxxx xx xxxxxxx xxxxxxxxx, xxx xxxxx xxxx xxxx x xxxxxxx xxxxxxx x xxxx xxxxxx-xxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxx xxxxx xx xxxx xxxxxxxxx xxxxxxxxxx xx xxxxx xxxxxx xxxxxxxxxxx xxx xxx xxxxxxxxx xx xxx xxxxxxxx xxxxxx xx xxxxxxxxxxxx xx% xxx xx% xxxxxxxx xx xxxx xxxxxx. xxxxx xxxxxxx xxx xxxxxxxxxxx xx x xxxxxxx xxx xxxxxxxxx xxxxxxxxxxxx xx xxxxxxxxxx xxxxx xxxx.

More from the Commission’s assessment

xxxxxxxx xxxxxxxxx xxxxxxxx xxxxxxxxxx xx x xxxxxxxx xxx xxxxxxxx xxxxx xxxxx xxxxxx xxxxxx xxx xxxxxxx xxxx xx xxxxxxxxxx xx xxxxxxx xxxxxxxx, xxxxxxx xxxxxx, xxxx xxxxxx, xxxxx xxxxxxxxxx xxx xxxxxxxx xxxxxxxx.

xxxxxx xxxxxxx xxxxxxxxxxx xxxxx xx xxxxxxxxx xxxxx xx xxxxxxxx’x xxxxx xxxx, xx xx xx xxxxxxxxx xx xxxxxx xx xxxx xxx xxxxxxxxxx xx xxxxxx xxxxxxx xxxxxxx xxxx xxx xxxx. xxxx xx xxxxxx xx x xxxxxxxx xxxxxx xxxx xx xxxxxx xxxxxxx xxxxxxxxx xxxxxxxx xxxx xx xxxxxxxxx xxxxxxxxxx xxx xxxxxx xxx xxxxxxxxxx xxxxxx, xxxxxxxxxxx xxx xxxxxxxxx-xxxxxxx xxxxxxx xx xxxx xx xxxxxxxxx xxxxxxxxxx.

The Commission’s proposed improvements for Slovenia (10 points)

xx xxx xxxx xxxx, xxxxxxxx xx xxxxxxx xx xxxx xxx xxxxxxx xx xxx xxxxxxxx xxxxxxxxxxxx xxxx xxxxxxxxxx xxx xxxxx xxxxxxx xx xxx xxxx xx xx xxxxxxxxx xx xx xxxxxxxx xxxx:

  1. xxxxxxx xxxxxxx xxx xxxxxxxx xxxxxxx xxxxxx xxxxxxxxxxx xxx xxxxxxx xxxxxx xxxxxxx xx xxxxxxxxx xxx xxxxxx xx xxxxx xxx xxxx xxxxx xxxxxxxxxx xxxxxxxxxxx xx x xxxxxxxxxxxxxxx xx xxx xxxxxxxx xxxxxx.
  2. xxxxxx, xxxxxxxx xxx xxxxxxxx xxx xxxxxx xxx xxxxx xxxx xx xxxxx-xxxxxxxxxx xxxxxxxxxxx xxx xxx-xxxxxxxxxxx xxxxxxxxx xxx xxxxxxx xxx xxxxx xxxxxxxxxx xx xxxxxxxxxxx.
  3. xxxxxx xxx xxxxxxx xxxxxx xxxxxxxxxxx (xxxx) xxxxxxxxxx xx xxxxxxxxxx xxxx xxxxxxx x(x) xx xxx xxxxxx xxxxxxxxxxx xx xxxxxxxx xxxxxxxxx (xxxx).
  4. xxxxxxx xxx xxxxxxxxxx xxx xxx xxxxxxxxxxx xxxxxxxxxx xx xxxxxxxxxxx xxxxxxxxx xxxxxxxxxx xxxx xxxxxxx x(x).
  5. xxxxxxx xxxxxxxx xxx xxxxxxx xxx xxx xxxxxxxxx xxxxxx xxxxx: xxxxxxxxxxxxxx xx xxxxxxxxxx xx xxx xxxxx-xxxxxxxxxx xxxxxxxxx, xxx xxxxx-xxxx xxxxx xxx xxxxxxxxx xxx xxx xxxxxx xx xxxxxx xxxxxxxx xxx xxx xxxxxxxxx xx xxxxxxx xxx xxxxxxxxxxxxxx xxxxxxxxx.
  6. xxxxxxx xxxxxxxxx xx xxx xxxxxxx xx xxxxxxxx xxx xxxxxxxx xxx xxx xxxxxxx xxxxxxx (x.x., xxxxxxxx xxxxxx xxxxxxx, xxxxxx xxxxxxx xxxxxxxxx, xxx xxxxxxxx xxxxxxxxxx, xxxxxx xx xxxxxxxxx xxxxxxxxx xx xxx xxxxx xxxxxxxx xxxxxxxxx).
  7. xxxxxxxx xxx xxxxxxxxxxxx xx xxx xxxxx’x xxxxxxxxxxxx xx xxx xxxxx’x xxxxxx xxxxxxxxxx xxxxxxx xx xxxxxxxxxx xxxx xxxxxxx x xx xxxxxxxxx (xx) xxxx/xxxx xxxxxxxxxxxx xx xxx xxxxxxxx xxxxx’x xxxxxxxxxx.
  8. xxxxxxxx xx xxxx xxxxxx xxx xxxxxxxxx xxxxxxx xxxxx xxxx, xxxxxxx x xxxxxxxxxxx xxxxxxxx xx xxx xxxxxxxxx xx xxx xxxxxxxxxx xxxxx xxx xxxxxx xxxx xxx xxxxxxxx xxx xxxxxxxx xxxx xxx xxxxxxx xxxxxxxxx xxxxx.
  9. xxxxxxx xxx xxx xxxxxxxx xxxxxxxx xxx xxxxxxxx xx xxx xxxxxxxxxxxxxxx xx xxxxxxx xxx xxxxxxxxxxx xxxxxxx x xxxxxxx xx x xxxxxxxx xxxxx-xxx xx xxxxxx xxxx xxxxxxx xx xxxx.
  10. xxx xxxxxxx xxx xxxxxx xxxxxxx xxxxxxxxx xxx xxxx xxx xxxx, xxxxxxx xxxx xxxxxxxx xxx xxxxxxx xx xxxx xx xxxxxxxxx xxxxxx xx xxxxxx xxxxxxx xxxxxxxxxxx. xxxxxxx xxx xxxxxxxxxxx xx xxxxxxxx xxx xxxxxxx xxx xxxxxxxx xxxxxx xxxxxxx xxxx xxxxxxxxxxx xxxxxxxxxxx xxxx xxx xxxxxxxxxx xxx xxxxxxxxxx xx xxxxxxxxx (xx) xxxx/xxxx xx xxxxxx xxxxxxxxxx (‘xxx xxx’).

xxxx xxx xxxxxxxxxx’x xxxxxxxx (xxx)

Using this page

All answers are up to date as of 29 October 2026. See what changed

How to cite this page: Renovate Europe EPBD Tracker: Slovenia, updated 29 October 2026, https://renovate-europe.eu/epbd-tracker/slovenia/

Terms such as MEPS, renovation passport or zero-emission building are explained in the EPBD glossary.

About the Renovate Europe EPBD Tracker