Spain

In short

Spain submitted its draft National Building Renovation Plan after extensive public consultation, and its draft revised building code covers most of the technical requirements. Financial support continues until at least 2030. Rules for energy performance certificates, technical systems and minimum energy performance standards are still needed.

Spain’s progress on the EPBD

Steps Spain has already taken and the obstacles ahead.

Progress unlocked

  • Comprehensive draft NBRP submitted in time, elaborated through extensive public consultation and participation
  • xxxxx xxxxxxx xxxxxxxx xxxx xxxxxxxx xxxx xx xxx xxxxxxxxx xxxxxxxxxxxx
  • xxxxxxxxx xxx xx xxxxxxxxxx xx xxxxx xxxxx xxxx, xxxxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxx xxxx xxx xxx xxxxxxx xxxxxx xxxx.

Obstacles ahead

  • EPC and technical systems regulation are missing. No news from the Ministry of Ecological Transition (MITECO) were published on this regard.
  • xx xxxxxxxx xx xxxxxxxxxxx xx x xxxx xxxxxxxxxx
  • xxxxxxxx xxxxxxxx xxx xxxxxxxx xxxxxxxxx xxx xxxxxxx.

What comes next for Spain

The next deadlines and the measures not yet published.

Next checkpoint

xx xxxxxxxx xxxx: xxxxxxxx xxxxxxxxx

xxx xxxx: xxxxx xxx xxxxxxxx xxxxxxxxx

=> xxxxxxxxx xxxxxx xx xxx xxxxxxxx xxxxxxxxxx xxx xxxx xx xxxxxxxxxxxx xx xxxxxxxx xxxxxxx, xxxx xx xxx xxx xxxxxxxxx xxxx.

Awaiting release

xxxxxxx xxxxx – xxxxx xxxx, xxxxx xxxxxxxx xxxx. xxxxxx xx xxx xxxxxxx xxx, xxxxxxx xxxxxxxxx xxxxxxx xxxxxxxxxxx.

Log in to read this section

This section is open to Renovate Europe partners, and to policymakers, media and public authorities with a reader account.

Topic by topic

Open a topic to see the answer, the sources and what the EPBD requires.

Coordinating ministry

xxx xxxxxxxxxx (xxxxxxxx xx xxxxxxx xxx xxxxx xxxxxx, xxx xxxxxxxx xx xxxxxxxxxx xxxxxxxxxx) xxx xxxxxxxxxxx xxx xxx xxxxxxxxxxxxx. xxxxxxx xxxxxx/xxxxxxxx xxxxxxxxx xxxx xxxxxxxxxx xxxx xxxx xxxxxxx xxx xxxxxxxx xxxxxx, xxx xxxxx xx xxx xx xxxxxxxx xxxxxxxxxxxx xxxxxxxxx xx xxxxxx.

Map the stock

Building databasexxxxxxxx xxxxx xxxxxxxxxxx xx xxxxxxx/xxxxxxxx xxxxxxxx xxxxxx

A national database on the energy performance of individual buildings and of the whole building stock. EPBD Article 22 Glossary

Status
xxxxxxxx xxxxx xxxxxxxxxxx xx xxxxxxx/xxxxxxxx xxxxxxxx xxxxxx
  • xxxxx xx xxx x xxxxxx xxxxxxxx, xxx x xxxxxx xx xxxxxxx xxxx. xxxxxx:
  • xxxxxxxx. xxxxxxxx xxxxxxxx xxxx, xxx, xxxxx xxxx xxx xxx. xxxx xxxxxx.
  • xxx xxxxxxxx. xx xxxxxxxx xxxxxxxxx xxxx xxx xxxxxxxxxxx xx x xxxxxxxx xxxxxx. xxxx xxxxxx.
  • xxxxxxx xxxxxxx xxx xxxxxxxxx xxxxxxxxxxxxx. xxxxxxxx xxxxxxxxx. xxxxxx xxxxx xxxxxxx.
  • xxxxxxxxxxx xxxx. xxxxxxx xxxxxxx xxxxxxxxx xxx xxxx xxxx xxxxx xxxxxx. xxxx xx xxxx xxxxxxxxxx xxx xxx xxxxxxxxx.

The database includes

  • xxx xxxx
  • xxxxxxxx xxxx / xxx
  • xxxxx xxxx
  • xxxxxxxxxxxx xxxxxx / xxx
  • xxxxxxx xxxxxx / xxxx xxxx
  • xxxxxxxxx xxxxxx xxxxxxxxxxxxx

Who can access it

xxxxxxxx xxxxxxxxxx

Good practice

xxxxxxxx xxx xxxxxxxxx xxx xxx xxxxxxxxxx, xxx xxxxxxx xxxxxxxx xx xxxx xxxxxxxxxxxxx (xxxxxxxx, xxxxxx xx xxxxxx, xxxxxxxx, xxxxxxx xx xxx xxxxxxxx, xxx, xxx, xxx), xxx xxxx xx xxxxxx xxxxxxxxx xx xxxxxx. xxxx xxx xxxxxxx xx xxx xxx xxxx xxx xx xxxxxxxxx xxx xxxxxxxxxx xx xxxxxxxx xxxxx, xx xx xxxx xxxxxxxx xx xxx xxxxx xxxxxxxx: xxxxxxx.xx

Sources

  • xxxxxxxx.
  • xxx xxxxxxxx.
  • – xxxxxxx xxxxxxx xxx xxxxxxxxx xxxxxxxxxxxxx. xxxxxxx xx xxxxxxx: xxxxxxx.xx .
  • xxxxxxxxxxx xxxx. xxxxxxxxxxx xxxxxx xxx xxxxxxx xxxx xxxxxxxxxxxx xxxxxxxx
Calculation methodxxxxxx xxxxx xxxxxxxxxx xx xx xxxxxxxxxxx

The national method for calculating the energy performance of buildings, on which energy performance certificates and minimum requirements are based. EPBD Article 4 and Annex I Glossary

Status
xxxxxx xxxxx xxxxxxxxxx xx xx xxxxxxxxxxx
Harmonised across the country
xxx

xxx xxxxxxxx xxx xxxxxxxx xxxxxxxxxxx xxxxxxxxxxxxx xxx xxxxxxx xxx xxxxxx’x xxxxxxx xx xxx xxxxxxxxxxx (x/x/xxxx) xxx xx xxxxxxx xxxxxx xxxxxxx (x/x/xxxx).

xxxxxxxxxxx xx xxxxxxxxxx xxxxxx xxx xxxxxxx, xxx xxxxxx xxx xxxxxxx xx xxxxx xxxxxxxxxx (xxxxxxx xxxxx, xxxxxxxxx xxx xxx xxx xxxxxxx, xxx.)

Sources

  • xxxxxx: xxxxxx xxxxxxxxxxx xxxxxxxxxxxxx xx xxxxxxxxx
  • xxx: xxxxx xxxxxx xxx/xxxx xx xxxxxx xxxxxxxxxxx xxxxxxxxxxxxx
Energy performance certificatesxxxxxx xxxxx xxxxxxxxxxx xx xxxxxxx xxxxxx

A certificate rating a building’s energy performance on a scale from A to G, with recommendations to improve it. EPBD Articles 19 to 21 Glossary

Status of the EPC reform
xxxxxx xxxxx xxxxxxxxxxx xx xxxxxxx xxxxxx

xxxxxxxxxxx xxx xxxxxxx xxxxxxxxx xxxx xxxxx xxx xxxxxxxxxxxxxx xx xxxxxxxx xxxxxxxxxxx. xxxxxxx, xxxxxxxxxx xxxxxxx-xxxxxxx xxxxxxxx xxxxxx xx xx xxxxxxx, xxxx xxxxxxxx xxxxx xxx xxxx xxxxxx xxxxxxxxxx xxxxxx xxxxxx xxx xxxxxxxxxx xxxxxx xx xxxxxxxx xxxxxx. xxxx xxx xxxxxxxxxx xx xxxxxxxxxxxxxxx xx xxxx xxxxxxx xxx xxxxxxx xxxxxx xx xxxxxxxxxx xxxx xxxxxxxxx xx-xxxx xxxxxxxxxx xxxxxxxxxxxx.

xxx xxxxxxxxxx xxx xxxx xx xxxxxxxxxxx (€xx–xxx xxx xxxxxxxx) xxx xxxxxxxxx xxx xxxx xxx xxxxxxxxx xxxxxxxxx xx xxxx xxxxxxxxxx, xxxxxxxxxxx xxxxxxxxx xxxxx xxxxxxx. xxxxxxxxxxx, xxxxxx xxxxxxxxxxxxx xx xxxxx xxxxxxxxx xx xxxxxxxx xxxxxxxxx xx xx xxxxxxxxxxxxxx xxxxxxxxxxx xxxxxx xxxx x xxxxxxxx xxxx xxx xxxxxxxxx xxxxxxxx xxxxxx xxxxxxxxxxx.

xxxxxxxxx xxxxxxxxxxx xxxxx, xxx xxxxxxxx xxxxxxxxx xxxx (xxxx) xx xxxxxxxxx. xxxxxxx xxxxxxxx xxxxxxxxx (xxxxxxxxx xx xxxx, xx xxxx, xxxxxxxx xx-xxxx, xxx, xxxx, xxx xxxxx) xxxx xxxxxx xxxxxxxx xxxxxxxxxxxxx xxxx xxx xxxxxxxx xx xxxxxxxxxxx xxxxxxxxxx xxxx xxx xxxxxxxxxx xxxxxxxxx xxxxxxxxxxxx.

Challenges

  • xxxx xxxxxxx
  • xxxx xx xxxxxx xxxxx
  • xxxx xxxxxxxxxxx

Promising move

xxxxxxxxx xxxxxxxxx xxx xxxxxxxxx x xxxx xxx xxxxxxx xxxxxxxx: xxxx.xx

Sources

  • xxxxxx: xxxxxx xxxxxxxxxxx xxxxxxxxxxxxx xx xxxxxxxxx
  • xxx: xxxxx xxxxxx xxx/xxxx xx xxxxxx xxxxxxxxxxx xxxxxxxxxxxxx

Plan the route

National Building Renovation Planxxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxxxxx

Each Member State’s plan to renovate its national building stock into a highly energy-efficient and decarbonised building stock by 2050, with targets for 2030, 2040 and 2050. EPBD Article 3 and Annex II Glossary

Status
xxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxxxxx

xxxxxxx xxxxx xxxx xx xxxxxxxxx xxxx xxx xxxxxxxxxxxx xx xxx xxxx, xx xxxxxx xx xxx xxxxxxxxxx xxxxxxxxxx. xxxxxxx, xxxx xxxxxx xxx xxxxxxx (xxxxxxxxxxxxxx xx xxxx, xxxxxxxxx xxx xxxxx xxxxxx, xxxxxxx xxx xxxxxxx xxx xxxxxx xxxxx, xxx xxxxxxxxxx, xxxxxx xxxxxxx xxxxxxx xxxxxx xxxx…).

Sources, including the draft plan

  • xxxxxxxx xxxxxxxxxx: xxxxxxxx xxxxxxxx xxxxxxxxxx xxxxx
  • xxxxxxxx xxxxxxxxxx: xxx xxxxxxxxxx’x xxxxx xxxxxxxxxx xx xxx xxxxx, xx xxxx xxxx
Renovation passportxxxxx xxxxxxx

A tailored, step-by-step plan for the deep renovation of a specific building, prepared by a qualified expert. EPBD Article 12 Glossary

Status
xxxxx xxxxxxx

xxxxx xx xx xxxxxxxxxx xx xxxxxxxxx xxx xxxxxxxx xxxxxxxx xxxxx xxxx xxxx xxxxx xxxxxxxxx xx xx xxxxxxxx.

xxx xxxxxxxx, xxx xx xxxxxxx xxxxxxxxxx xxxx xx xxxxxx xxx xxxxxxxx xxxxxxxxxx xxxxxxxx xxxx xxx xxxxxx xxxxxxxxxxx xxxxxxxxxxx (xxx), xxx xxxxxx, xxxxxxx xxx xxxxxxx xxxxx xxxxxx xxx xxxxx xxxxx xx xxxxxxxx xxxxxxxxxx xxxxxxxx, x.x., xxxxxx xxxxxxxxxxx xxx xxxxx xxxxxxxxxxxx, xxx xxxxxx xxxxxxxxxx xxxx xx xxxxx-xxxxxx xxx xxxxxx xxxxxxxxx.

xxxxx xxx xx xxxxxxx xx xx x xxxxxxx xxxx (xxxxx xxx xxxxxxxx xxxxxxxxx, xxx) xxxxx xxxxxxxxx xxx xxxxxxxxxx xx xxx xxxxx. xx xxx xxxxxx x xxxxxxxx xxxxx, xxxx xxxx xxxxxxxxxxxxxxx xxx xxxxxxxx. xx xxx xxx xxxx xxxxxxxxx xx xxxx xxx xxx xxxxxxxxxxx xx xxxxxxxxxxx xx x xxxxxxxx.

How it is or will be designed

  • xxxxxxxxx xxxxxx
  • xxxxx xx xxx xxxxxxxx
  • xxxxxx xx xxxx
  • xxxxxxxx xxxx xxxxxxxxx
  • xxxxxxxx xxxxxx xxxxxxx xxxxxxxx
  • xxxxxxxx xxxxxxxxxxxxxxx xxx xxxxxx-xxxx xxxxx-xxx

Who can issue it

xxxxxxxxxx, xxxxxxxxx xxxxxxxxxx xx xxxxx xxxxxxxxx xxxxxxx xx xxx xxxxxxxx xxxxxx;

xxxxx xxxxxxxxx xxx xxxxxx x xxxxxxx xxxxxxxxx xxxxxx;

xxxxx xxxxxxxxxxxxx xxx xxxxxx xxx xxxx xxxxxxxxx xxxxxx.

[xxx xxxxxx xxx xxx xxxxxxx xxxx xxxx xxxxxxx xx xxx xxxxxxxx]

Sources

  • xxxxx: xxxxx xx xxx xxxxxxxx xxxxxxxxxx xxxxxx (xxx)
  • xxxxxxxx xx xxxxxxx: xxxxxxx xxxxxxxxx xxx xxx xxxxxxxx xxxxxxxx xxxxxxx

Set the standards

Zero-emission buildingsxxxxxxxxxx xxxxx xxxxxxxxxxx xx xxxxx xxxxxxxxx

A building with a very high energy performance that needs zero or a very low amount of energy, produces no on-site carbon emissions from fossil fuels and zero or very low operational greenhouse gas emissions. EPBD Article 7(1), Article 11 Glossary

Status of the definition
xxxxxxxxxx xxxxx xxxxxxxxxxx xx xxxxx xxxxxxxxx
Ready for the EPBD deadlines for new buildings
xxx
Used as a benchmark for deep renovation
xxx

xxx xxx xxxxxxxxxx xxxx xxxxxxxxxx xxx xxxxxxx xxxx xxxxxxxxxx xx xxx xxxxxxxx xxxx. xxxx xx, xxx xxx xxxxxxxx xx xxxx xxxxxxxxxx (xxxxxxxxx xx xxxxxxxxxxxxx xxxxxxx xxx xxx xxxxxx) xxxx xxxx xx xxxxxx xxxx xxx xxxxxx xxxxxxxxx xx xxx xxxxxxxx xxxx, xxxx xx, xxx xxxxxxxx.

Main concern

xxx xxxxx xxx xxxxxxxxx xxx xxxxxxxxxxxx xx xxxxxxxx xxxx xxx xx xxxxxxxx xx xxxxx xxxx xxxxx xx xxx xxx xx xxxx.

xxxxxxx, xxx xxx xxxxxxxxxx xxx xxx xxxxxxx xxx xxxxxxxxx xx (xx xxxxx) xxx xx% xx xxxxxx xxxxxx, xxx xxxxxxxx xxxxxxxxx xx xxxx-xxxxxxx xxxxxx.

Promising move

xxxxxxx xxx xxx xxxxxxxx xxx xxxxxx xx xxx xxxxx xxxxxx xxx xxxxxxxx xxxx, xxxxxxx xx xxxxxx xxxxxxxxx xxxxxxxxx (xxxxxxxx xxxx; xxxx; xxx). xxxx xxxxxxxx xxxxxxx, xxxx xxxxxxxx xxx xxxxx xxxx xxx xxxxxxx xxxxxxxxxxxxxx (xxxxx, xxxx…) xx xxxx xx ‘xxxxx xxxxx’ xx xxxxx xx xxxxxx.

Sources

  • xxxxxxxx xx xxxxxxx: xxxxx xxxxx xxxxxx xxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxx
MEPS and trajectories for residential buildingsxxx-xxxxxxxxxxx xxxxxxxxx: xx xxxx xxxxxxxxxxxxxxxxxxxxx xxxxxxxxx: xxxxx xxxxxxxxxxxx xxxxxxxxx

Rules that require non-residential buildings to meet a minimum energy performance by set dates, starting with the 16% worst-performing by 2030 and the 26% by 2033. EPBD Article 9(1) Glossary

Each Member State’s national trajectory to reduce the average primary energy use of residential buildings by at least 16% by 2030 and 20 to 22% by 2035, compared with 2020. EPBD Article 9(2) Glossary

Non-residential buildings
xx xxxx xxxxxxxxxx
Residential buildings
xxxxx xxxxxxxxxxxx xxxxxxxxx

xxxx xxx xxx-xxxxxxxxxxx xxxx xxx xxxx xxxxxxxxx xxx, xxx xx xxxxx xxx xxxx xxxxxxxxx. xxxxxxx, xxxx xxx xxx-xxxxxxxxxxx xxxxxxxxx xxx xxxxxxxxx xx xxx xxxxx xxxx, xxxxx x xxx xxxxx xxxxxx xx xxxxxxxx xx xxxxxxxxx xxx xxxx xxxxxxxxx.

xxx xxxxxxxxxxx xxxxxxxxxx xxx xxxxxxxxx xx xxx xxxx xxxxx xx xxxxxx. xxxx xxxxxxxxxx xxxxxxxx xxx xxxxxxxxxxx (xxxxxx xxx xxxxxx xxxxxxx, xxxxxx, xxx.). xxx xxxxxxxxxx xx xxxxx-xxxxxxxxxx xxxxxxxxx xxxxx xxxxx xxx xxxxx xx xxxxxx xxx xxxxxxxxxxxxxx.

xxxx xx/xx/xxxx, xxxxxxxx xxxxxxxxxxx xxxxxxxxx xxxx xxxx xx xxxx xxxxxxx xxxxxx xxxxxxxxxx xxxxxxxxx (xxxxxxxxxx xx x xx x) xxx xx xxxxxx xxxx xxxxx xxxx xx xxxxxx. xx xxxx, xxxx xxxx xx xxxxxx xx x.

Coverage

  • xxx-xxxxxxxxxxx xxxxxxxxx
  • xxxxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxx
  • xxxxxx xxxxxxxxx
  • xxxxxx xxxxxxx

Sources

  • xxxxxxxx xxxxxxxxxx xxxxxxx: xxxxxxxx xxxxxxx

Activate smart performance

Technical building systemsxxxxx xxxxxxxxx

A building’s equipment for heating, cooling, ventilation, hot water, built-in lighting, automation, on-site renewables and storage. EPBD Article 13 Glossary

Status
xxxxx xxxxxxxxx
Checks required after installation
xxx

xxxxxxxxx xxxxxxxx xxxxxxx xxx xxxxxxxxx xx xxx xxxxxxx xxxxxxxxxxxxx xxxxxxxxxx xx xxxxxxxxx (xxxx). xxx xxxxxx xxxxxxxx x xxxxxxxxxxx xxxxxxxxxxxx (xx/x/xxxx), xxx xx xxxxx xxx xxxxxxxxx xxx.

xxxxxxxx xx xxxxxxxx xx xxx xxxxxxxx xxxx (xxx). xxxxxxxxxxxx xxxx xxx xxxx xxxx xxxxxxxx xx x xxxxx xxxxxxxxx xxxxx xxxxxxxxx xx xxxxxxxx xxxx, xxxxx xx xxx xx xx xxxxxxxx xx xxx xxx xx xxxx.

Systems covered

  • xxxxxxx
  • xxxxxxx
  • xxxxxxxx xxx xxxxx
  • xxxxxxxx
  • xxxxxxxx xxxxxxxxxx xxx xxxxxxx
  • xx-xxxx xxxxxxxxx xxxxxx
  • xxxx xxxxx

Main concern

xxxxx xx xxxx xxx xxxxxxxxx xxx xxxx xx xxx xxxxxxxxxxx xxxx xxxx xxxxxxxxx.

Promising move

xx

Sources

  • xxxxxx: xxxxxx xxxxxxxxxxxx xx xxxxxxxx xxxxx xxxxxx xxxx/xxxx (xxxx)
  • xxxxxxxx xx xxxxxxx: xxxxx xxxxx xxxxxx xxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxx
Automation and control (BACS)xxxxxxxxxxxx xxxxx xxxxxxxxxxx

Software and controls that run a building’s heating, cooling, ventilation and lighting automatically and efficiently. EPBD Article 13(9) to (12) Glossary

Status
xxxxxxxxxxxx xxxxx xxxxxxxxxxx
Requirements for non-residential buildings include
xxx, xxx xxx-xxxxxxxxxxx xxxxxxxxx xxxxx xxx xx xxxxxxxxx xxxxx xxxxxx
Aligned with the EPBD deadlines
xxx xxxxxxx

xxx xxxxxxxx (xxx), xxx >xxxxx xxxxx xx xxxxxxxx xx xx xxxxxxxx xx xxx xxx xx xxxx (xxxxx xxxx xxxxx x xxxxx xxxxx). xxx xxxxx xx >xxxx xxx xxxxxxx xx xxx xxxx xxxxxxxx, xxxxx xxxxx xxxxx xxx xxxx xxxxxxxx.

xxx xxxxx xxxxxxx (xxxx), xxx xxxx xx xxxx xx xxxxxxxx xxx xxxxxxxxxxx xxxxxxx.

xxx xxxxxxxx xx xxx xxxxxxx xxxxxxxx xxxx xxxxxxxx xxxxxxxxxx xx xx-xxx xx xxxxxxxxxx xx xxxxxxxx xxxxxxxxxxxxx. xxxxx xxx xx xxxxxxxxxx x xxxxxxx xxxxxxxxxxxxx xx xxxxxxx xx.x

* xxx xxxxxxx xxxxxxxxxxx xxxxx (xxxx) xxx xxxx xxxxxxxxxxxx xxx xxx xxxxxxxxxxx xx xxxxxxxx xxxxxx, xx xxxxxxxxxx xxxx xxx xx xxxxx-x

* xx xxxxxxxxxxx xxx xxxxxxxx xxxxxxxxxx xxx xxxxxxx xxxxxxx xx xxxxxxx xxx xx xx xxxxxx xxxxxxxxxx xxxxxxxx

* xxx xxxxx xx xxxxxxxxxxx xx xxxxxxx xx xxxxxxx xx xxxx xxxx xxxxx xxxxxxxxx, xxxxxxx xxx xx xxx xxxxx xxxxx xx xxxx xxxx xxxx

Buildings covered

  • xxx-xxxxxxxxxxx xxxxxxxxx xxxxx xxx xx xxxxxxxxx xxxxx xxxxxx
  • xxx xxx-xxxxxxxxxxx xxxxxxxxx
  • xxx xxxxxxxxxxx xxxxxxxxx
  • xxxxxx-xxxxxx xxxxxx xxxxxxxxxx xxxxx xxxxxxxxxxx
  • xxxxxxxxxxx xxxxxxxxx xxxxxxxxxx xxxxx xxxxxxxxxxx

Sources

  • xxxxxx: xxxxxx xxxxxxxxxxxx xx xxxxxxxx xxxxx xxxxxx xxxx/xxxx (xxxx)
  • xxxxxxxx xx xxxxxxx: xxxxx xxxxx xxxxxx xxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxx
Indoor environmental qualityxxxxxxx xxxxxxxxxxxx xx xxxxxxxxxxxx xxxxx xxxxxxxxxxx

The conditions inside a building that affect people’s health and wellbeing, such as temperature, humidity, ventilation and pollutants. EPBD Article 13(4) Glossary

Requirements in national rules
xxxxxxx xxxxxxxxxxxx xx xxxxxxxxxxxx xxxxx xxxxxxxxxxx
Linked to renovation or upgrades
xxx

xxx xxx xxxxxxxxxxxx xxx xxxx xx xxx xxxxxxxx xxxx, xxxx xxx xxxxx xxxxxxxxxx xxxx xxxxxx xxxx xxxx. xxxxx xxxxxxx xxxxxxxx xx xxx xxxxxxxx xxxx: xxxxxx xxxxxxx xxxx, xxxxxxxxxx, xxxxxxxxxxxxx, xxxxxxxxxxx, xxxxx, xxxxx xxxxxxxxxxxxx, xxxxxxxxx xxxxxxxxx xx xxxxxxxx. xxx xxxxx xx xxxxxxx xxxxxxxx xxxx: xxxxxxxx xxxxxxx.

Elements covered

xxxxxxx xxxxxxxxxxx+xxxxx

Main concern

xxxxxxx xxxxxxx xx xxx xxxxxxxx.

Sources

  • xxxxxxxxx xxxxxxxx xxxx (xxx)
Smart readiness indicatorxxxxxxx, xxxxx xx xxxxxxxxxxx xxxxx

An optional EU rating of how well a building can adapt its operation to the needs of its occupants and of the grid, and improve its efficiency. EPBD Article 15 Glossary

Status
xxxxxxx, xxxxx xx xxxxxxxxxxx xxxxx

xxxxx xx xxxx xx xxx xxxxxxxx xxx xxxx xxxxx.

xxx xxxx xxxxx xxxxxx xxxx xxxxxxx xx xxxx xx xx xxxx.

xxx xxx xxxx xxxxx xx xxxxx xx xxx xx xxx xxxxxxxx xxx xxx xxxxxxxxxx xxxxxxxxxx xxx xxx xxxxxxxxxxx xxxxxxxxx xxxx xxx xxxxxxx xx xxxxx – xxxxxxxx xxxxxxxxx xxxxxx xxxxxx xxxxxx xxx xxxxxxx xx xxx xxxx xxxxxxx xxxxxxxxxx. xxxxx xxxx xxxxxxxx xxx xxxx xxxxxxxx xxx xxxxxxxxxx xx xxx xxxxxxx: xxxxxxx, xxx-xxxxx, xxxx.

xxxxxx xxx xxxx xxxxx xx xxxxx, xxx xxxxxxxxx xxxx xxxxxxx xx xxx xxxxxxx xxxxxxx xxx xxxxxxxxxx x-xxxxxxxx xxxxxxxxx, xxxxxxxx xxxxxx xxx xxxxxxxxxxxx. x xxxxx xx xxx xxx xxxxxxxxxxx xxxx xxxxxxxxx xxxx xxx xxxxxxx’x xxxxxx xxxx, xx xx xxxxx xxxx xxxxx xxxxxx xxx xxx-xxxxxxxxx xxxx xxxxx. xxxx xxxxxxxxxxxx xxxx xxxxxxxx xxxxxxxx xxxxxxx xxxxxxxxxxxx xxxxxxxxxx xxxxxxxxxx, xxxxxxxxx xx xxxxxxxxxx xxxxxxxx xxx xxxxxxxxxxx xxxxxxxxxxx xxxxxxxx xx xxx xxxxxxxx xx xxx xxxxxxxxx (x.x. xxxx xxxxxx) xxx xxxxxxxx xxxxxxxxx-xxxxxxx xxxxxx xxxxxxxxx xxxx xxxxx xxxxxxxxx xxx xxxxxxxxx xxxxxxxxxxxx xx xxx xxxxxxx xxxxx xxxxxxxxx xxxxx xxxxx.

Building types covered

xxxxxxx

Sources

  • xxxxxxxx xxxxxxxxxx: xxx xx xx xxxxxxxxx

Cut the carbon

Whole-life carbonxxxxxxxxxxx, xxxxxxx xx xxxxx xxxxx xxxxxxxxxxx

All the greenhouse gas emissions of a building over its life: making and transporting materials, construction, energy use, replacements and demolition. EPBD Article 7(2) and (5) Glossary

Status
xxxxxxxxxxx, xxxxxxx xx xxxxx xxxxx xxxxxxxxxxx

xxx xxxxxxx xxxxxxxx xxxx (xxx) xxxx xxxxxxx x xxxxxxx xxx xxx, xxxxxxxxx x xxxxxxxx xxxxxxxxxxx xxxxxxxxxxx xxx xxxxxxx xxxxxx. xxxx xxxx xx xxxxxxxxx xx xxx xxx.

xxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxxx-xxxx-xxxxxx xxxx xx xxxxxxxxxxx xxxx xx xxxxx.

Steps taken

  • xxxxx xxxx xx x xxxxxxxx xxxxxxxxxxx xxxxxx
  • xxx xxxxxxxxx xxxx xxxx xx xxxxxxxx xxxx-xxxxx xxxxxxxxx
  • xxxx xxxxxxxxxxx xxxx xx xxxxxxxx xx xxxx
  • xxxxx xxx xxxxx xxxxxxxx xx xxxxxxxxx xxxxx

Sources

  • xxxxxxxx xx xxxxxxx: xxxxx xxxxx xxxxxx xxxxxxxx xxx xxxxxxxxx xxxxxxxx xxxx
  • xxxxxxxx: xxxxx-xxxx xxxxxx xxxx xxx xxx xxxxx xxxxxxxxxxx
Phasing out fossil fuelsxxxxxx xxxxx: xxxx xxxxxxxxxx xxxxxx, xxxx xxxxxxxx xxxxxxxxxxx

Since 1 January 2025, Member States can no longer offer financial incentives for installing stand-alone boilers powered by fossil fuels, and they must plan the phase-out of fossil-fuel boilers. EPBD Article 13(7), Article 17(15) Glossary

Financial incentives for new stand-alone fossil-fuel boilers ended
xxxxxx / xxxx xxxxxxxxxx xxxxxx / xxxxxxxx xxxxxxxxxxx
National pathway to phase out fossil fuels in heating and cooling
xx
Oil boilers in new buildings
xxxxxxxxxxx
Oil boilers in existing buildings
xxxxxxx
Gas boilers in new buildings
xxxxxxxxxxx
Gas boilers in existing buildings
xx xxx xxxxxxxxxx
Stand-alone fossil-fuel boilers
xx xxx xxxxxxxxxx
Fossil-fuel connections in new buildings
xxxxxxxxxxx

xxxxx xxx xx xxxx xxx x xxxxx-xxx xxxx xxx.

xxxxxxx, xxxxx xx x xxxxx xxxxxxxxxxx: xxx xxxxxxxx xxxx (xxx) xxxxxxxx xxxxxx xxx xxx-xxxxxxxxx xxxxxx xxxxxxxxxxx (xxxx xxx-xx-xxx). xx x xxxxxx, xxxxxx xxxx xxxxxxx xxx xxxxxxxx xxxx xxxxxxxxxx xxxx xxxxxxxx xxxxxxx xxx xx xxx xxx xxxxxxxxx. xxxxxx xxxx xxxxxxx xxx xxxxx xxxxx xxxxxxxxx, xxx xxxxx xx x xxxxxxxxx xxxxx.

xxxx xxxxx/xxxxxxxx xxxxxxxxxx xx xxxxxx xxx xxxxxx-xxxxx xxxxxxx xx xxx xxxx xxxxx.

xxx xxxxxxxx xxxx xxxxxxxxxxxx xxx xxxxxxxxx xxxxxx xxxxx xxx xxxxxxxxxx xx xxxxxx-xxxxx xxxxxxx. xxxxxxxx xxxxxxxxxxx xxxxxxxx, xxx xxxxxxxxx xxx xxxxxxx xx xxxx xxxxx, xxxxxxxx xxxxxxx, xx xxxxxx xxxxxxxxx.

xx xxxxxxx xxx xxxxxxx xxx xxxxxx xxxxx xxx xxxxxxxxxxx xx xxx xxxxx xxxx.

Main concern

xxxx xx xxxxxxx xxx xxxxxx xxxx xxxxxxx xxx xxxxx xxxxxxxx.

Promising move

xx

Enable delivery

Financing renovationsxxxxxxxxx xx xxxxxx xx xxxxxxxxxx xxxxx xx xxxxxx xxxxxxxxxxx

The grants, loans, tax breaks and other support Member States give for renovation, which must be linked to the energy savings targeted or achieved. EPBD Article 17 Glossary

Linked to renovation depth or energy performance
xxx
Measures for vulnerable and energy-poor households
xxx
  • xxxxxx & xxxxxxxxx. xxxxx xx xxxx-xxxxxxxxxx xxxxx xxx xxxxxxxx xxxxxxx xxxx. xxxx xxx xxxxxx xxxxxxxxx xx xxxxx xx xxxxxxxxxx (xxxxxx xxxxxx >xx% xx >xx%), xxxxx (xxxxxxxx, xxxxxxxxxxx xxxxxxxx, xxxxxxxx xxxxx) xxx xxxxxxxxxxx (xxxxxx, xxxxxxxxx, xxxxxxxxxxxxx, xxxxxxxx)
  • xxxxxxxxxx xxxxx. xxx xxxxx xxx xxxxxx xxxxx xxx xxxxxxxxxx xxxxx, xxxxxxxx x xxxx xxxxxx xxxxxxxxx xxx xxxxxxxxx. xxxxxxxx xxxx x-x%.
  • xxxxxx xxxxxxxxxxx xxxxxxxxxxx. xxxxxx xxx xxx-xxxxxxxxxxx, xxx xxxx xxxxxxxxx xxx xxxxxxxx xxxx xxxxxxxx xxxxx xxx xxxxxxxxxxx xxx (xxx xxxxxxxxxxx, xxxxxxxxx, xxxxxxx…)
  • xxx xxxxxxxxxx. xxxxxxxxxx xxxxx xxx xxxxxxxxxx.
  • xxxxxx xxxxxxx xxxx xxxxxxxx. xxxxxx xxxxxxx xxxx xxx xxxxxxxxx, xxxx xxxxxxx xxxxxxxxx xx xxx xxxxxxxx xxxxxxx xxxx.
  • xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx. xxxxx xxxxxxxxx xx xxxxxxxxxx xxxxx, xxxxxxxx xx xx xxx% xx xxxxx.
  • xxxxxxx xxx xxxxxx xxxxxxxxx. xxxxxxxx xxxx xxxxxxxxx (xxxx, xxxx xxxx, xxxx xxxxxxx, xxxx xxxxxxxxx)

National financing instruments

xxxxxx

xxxxxxxxx

xxxxxxxxxx xxxxx

xxxxxx xxxxxxxxxxx xxxxxxxxxxx

xxx xxxxxxxxxx

xxxxxx xxxxxxx xxxx xxxxxxxx

xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx

xxxxxxx xxx xxxxx-xxxxxxxxx xxxxxxxxx

xxxxxxx xxx xxxxxx xxxxxxxxx

xxxxx: xxxxxxx xx xxxxxxxxxx xxxxxxxxx xx xxxxxxxxx xx xxx xxxx, xxx xx xxxxxxxx xxxxxxx xxx xxxxxxxxx.

Promising move

xxxxxx xxxxxxxxx xx xxx xxx xx xxx xxxxxxx xxxxx xxx xxxx xx xxxxxxx xxx xxxxxxxxxx xx xxx xxxxxxxxxx xxxxx xxx xxxxxxxxxxx xxxxxxxxx. xxx xxxxxxx xx xxxx xxxxxx xxxxx xxx xxx xxxxx (xxx xxxx xx xxxxxxxxxxx xxxxxxxxx), xxx xxx xxxxxxxxxx xxxx xxxxxx xxxxxxxx.

Sources

  • xxxxxxxx xx xxxxxxx: xxxxx xxxxxxx xxxx xxxx-xxxx
  • xxxxxxxxxx xxxxx xxx xxxxxxxxxxx xxxxxxxxx. xx. xxx.xx ; xxxxxxxxx.xxx
  • xxxxxx xxxxxxx xxxx xxxxx
One-stop shopsxxxxx, xxxxx, xxxxxxxx xx xxxxxxx xxxxxxxx

An advice centre that guides homeowners, businesses and public bodies through a renovation, from the technical options to financing. EPBD Article 18 Glossary

Status
xxxxx, xxxxx, xxxxxxxx xx xxxxxxx xxxxxxxx

xxx xxx xxxxxxxxxx xxxxx xx xxxx xxxxxx (xxxxxxxx, xxxxxx, xxxxxx, xxxxxxxxx…) xxx xxxxxxx (xxxxxx xxxxxxx, xxxxxxxxx), xxx xxxxx xx xxx x xxxxxxxx-xxxx xxxxxxx.

xxx xx xxxxx xxxxxx xxxxx xx xxxxxxxxxxx xxxxxx. xxxx xxxxxxxxxxx xx xxx xxx xxxxxx xxxxxxxxx xxxxx (xxxxxxxx xxxxxxx xx xxxxxx xxx xxxxxxxxxxx xxxxxxx)

xxxx xxx xxxxxxx xxxxxxxx xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx xx xx xxxxxx xxxxxxx.

Services provided

  • xxxxxxxxx xxxxxx
  • xxxxxxxxxxxxxx xxxxxxx
  • xxxxxxxxx xxxxxx
  • xxxxxxx xxxx xxxxx xx xxxx xxxxxxxxxxxx
  • xxxxxxxxxx xxxxxxxx
  • xxxxxxx xxxxxx xxxxx
  • xxxx-xxxxxxxxxx xxxxxxxxxxxx
  • xxxxxxx xxx xxxxxxxxxx xxxxxxxxxx
  • xxxxxxx xxx xxxxx-xxxxxxxxx xxxxxxxxx
  • xxxxxx xxxxx

Who runs them

  • xxxxxxxx xxxxxxxxxxx
  • xxxxx xxxxxxxxxxx
  • xxxx
  • xxxxxxx xxxxxxxxx
  • xxxxxx-xxxxxxx xxxxxxxxxxx

Sources

  • xx xxxxx: xxxxxxxxx xxx
Skills and workforcexxxxxxxx xx xxxxx xxxxxxxxxxx xxxxxxx xx xxxxxxxxxxx

Education and training to build a skilled workforce able to deliver renovations at the scale needed. EPBD Article 17(12) Glossary

National skills or training initiative
xxxxxxxx xx xxxxx xxxxxxxxxxx xxxxxxx xx xxxxxxxxxxx
Workforce shortages a barrier
xxx, xxxxx xxxxxxx

xxxxxxxx xxxx xxxxxxxxxxx xxxx xxx xxxxxxx xxxxxx xxx xxxxx (xxxxxxxxx xxxxxxx xx xx xxxxxxxxxxxx, xxxxxxxxx xxxx xxxxxxx…), xxxxx xxx xx xxxxxx/xxxxxx xxxxxxxxxx xx xxxxxx.

Main concern

xxxxx xx x xxxx xxxx xx xxxxxxxxx xxx xxx xxxxxxx xxxxxxxxx xx xxxxxx.

Sources

  • xxxxx xx: xxxxx xx xxxxxx xxxxxxxx

Commission feedback on the draft renovation plan

xxxxxxxx xxxxxxxxxx, xx xxxx xxxx, xx xxx xxxxx xxxxxxxx xxxxxxxx xxxxxxxxxx xxxx xx xxxxx.

The Commission’s overall assessment

xxxxx xxxxxxxxx x xxxxxxxx xxx xxxxxxxxxxxxx xxxxx xxxx xxxxx xx xxx xxxxxxxx xxxxxxxxxx xx xxxxxxx x xx xxx xxxxxx xxxx. xxx xxxxx xxxx xxxx x xxxxxxxx xxx xxxx-xxxxxxxxxx xxxxxxx xxxxxxx xxxxxxxxx x xxxxxx xxxxxx-xxxxxxxxx xxx xxxxxxxxxxxx xxxxxxxx xxxxx xx xxxx. xx xxxx xx xx xxxxxxxxx xxxxxxxxxx xx xxx xxxxxxxx xxxxxx xxxxxxxxx xx xx% (xx xxxx) xx xxxxxxx xxxxxx xxxxxxxxxxx xxx xxx% (xx xxxx) xx xxx xxxxxxxxx.

More from the Commission’s assessment

xx xxxxxxx xxx xxxxxxxxxxxxxx xx xxx xxxx, xxxxx xxxxx xxxxxxxx xxxxxxxxxx xxxxxxx xxxxxxxxxx xx xxxxxxx xxx xxxxxxxx xxxxxx xxxxxxx xxx xxxxxx xx xxxxx xxx xxxxxxxxxxx xxxxxxxxx xxxxxx xxxxxxxxxxx xx xxxx-xxxxxxx xxxxxx.

xxxxx xx xxxxxxxxxx xxxxxxx xxxxxxxxxxxxx xx xxxxxxxxxx xxx xxxxxxxxxxxx xx xxxxxx xxx xxxxxxxxxx xxxxxx xxxxxxxxxx. xx xxxxxxx xxxx, xxxxxxxxx xxxxxxx xxxx xx xxxxx xx xxxxxxxx xxxxxx xxxxxxxxxx xxx xxxx xxxx xxxxxxxxx xxx xxxxxx xx xxxxxxxxxx xxxx, xxxx xxx xxxxxxxxxxx xxxx xxxx xxxxxx xxxxxxxxx xxx xxxxx xxxxxxxx xxx xx xxxxx xxxx xxxxx.

xxx xxxxx xxxx xxxx xxxxxxxx xxxx xxxx xxxxxxxxx xxxx xx xxxxxxxxx xxxxxxx xxx xxxxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxx xxx xxx xxxxxxxxxxxxxx xx xxxxxxxxxxxxxx xxxxxxxxxx xxx xxxxxxxx xxxxxxxxxx, xxxxxxxxx xxxxxxxxxxxxxx.

The Commission’s proposed improvements for Spain (7 points)

xx xxx xxxx xxxx, xxxxx xx xxxxxxx xx xxxx xxx xxxxxxx xx xxx xxxxxxxx xxxxxxxxxxxx xxxx xxxxxxxxxx xxx xxxxx xxxxxxx xx xxx xxxx xx xx xxxxxxxxx xx xx xxxxxxxx xxxx:

  1. xxxxxxx xxxxxxxxx xx xxx xxxxxx xx xxxxxxxx xxx xxxxxxxx (x.x. xxxxxxxx xxxxxx xxxxxxx, xxxxxx xxxxxxx xxxxxxxxx, xxx xxxxxxxxx xxxxxxxxx, xxxxxx xx xxxxxxxxx xxxxxxxxx xx xxxx xxx xxxxx xxxxxxxx xxxxxxxxx).
  2. xxxxxxxx xxx xxxxxxxxxxxx xx xxx xxxxx’x xxxxxxx xxx xxxxxx xxxxxxxxxx xxxxxx xxxxxxxxxxxx xx xxx xxxxxxxx xxxxx’x xxxxxxxxxx.
  3. xxxxxxx xxx xxxxxxxx xxxxxxxx xx xxx xxxxxxxx xxxxxxxxxxx xxxxxxx xxxxxx xxx xxx xxx xxx xxxxxxx xxx xxxxxx xxxx xxx xxxxxxx xxxxxxx xxxxxx xxx xx xxxxxxxxxxx xxxxxxxxx xxxxxxxxx xxx xx xxxxxxx xxx xxxx xxxxxxxxx xxx xxxxxxx (xxxxx xxxx xxx xx xxxxxxxx).
  4. xxxxxxx xxx xxx xxxxx-xxxxxxxxxx xxxxxxxxx xxx xxxxxxxxxxx xxx xxxxxxxxxx, xx xxxxxx xxxxxxxxx xxxxxxxxxx xxxxxxxx xxx xxxxxxxx xxx xxxx xxxxxxx xxxx xxxxxxxxxxx.
  5. xxxxxxxx xx xxxx xxxxxx xxx xxxxxxxxx xxxxxxxxx xxxxx xxxx xxx xxxxxxx x xxxxxxxxxxx xxxxxxxx xx xxx xxxxxxxxx xx xxx xxxxxxxxxx xxxxx.
  6. xxxxxxx xxx xxx xxxxxxxxxxx xx xxxxxxxxx xxx xxxxxx xxxxxxx xxxx xx xxxxxxxxx xxx xxxxxxxxx xxxxxxxxxx xxxxxxxx xxx xxx xxxxxxx xxxxxx xxxx, xxxxxxx xxxx xxxxxxxx xxx xxxxxxx xx xxxx xx xxxxxxxxx xxxxxx xx xxxxxx xxxxxxx xxxxxxxxxxx.
  7. xxxxxxx xxx xxx xxxxxxxx xxxxxxxx xxx xxxxxxxx xx xxx xxxxxxxxxxxxxxx xx xxxxxxx xxx xxxxxxxxxxx xxxxxxx x xxxxxxx xx x xxxxxxxx xxxxx-xxx xx xxxxxx xxxx xxxxxxx xx xxxx.

xxxx xxx xxxxxxxxxx’x xxxxxxxx (xxx)

Using this page

All answers are up to date as of 29 October 2026. See what changed

Information for Spain was gathered with input from Green Building Council España (GBCe), a member of Renovate España, Renovate Europe’s national partner in Spain.

How to cite this page: Renovate Europe EPBD Tracker: Spain, updated 29 October 2026, https://renovate-europe.eu/epbd-tracker/spain/

Terms such as MEPS, renovation passport or zero-emission building are explained in the EPBD glossary.

About the Renovate Europe EPBD Tracker